Connectivity Guide
Bardoli Satellite City: Connectivity, Roads, Rail and Metro Links
Bardoli is one of five towns Gujarat has chosen to develop as satellite towns beside its major cities, and it falls under the Surat Urban Development Authority. As of November 2026, its main transport links are a Hazira road project, a bullet train section targeted for 2027 at Surat, and the Surat Metro, which began trial runs in March 2026.

| Status (as of November 2026) | Announced satellite town, notified October 2025; master plan process begun January 2026 |
|---|---|
| Development authority | Gujarat Urban Development Department (Surat Urban Development Authority covers the town) |
| Hazira-Bardoli road | Project road of about 131.8 km; last dated progress figure 16.32% as of March 2011 |
| Bullet train, Surat to Bilimora | Under construction; first section targeted to open in 2027 (launch date given as 15 August 2027, announced January 2026) |
| Surat Metro Phase 1 | Under construction; 40.35 km, 38 stations; first trial run 29 March 2026 |
| Surat Metro extension to Antroli | Proposed in May 2026: 4.4 km with three new stations |
| Chennai-Surat highway corridor | Revised in December 2025 to run Chennai to Nashik, about 900 km, instead of starting at Surat |
Satellite town status
Gujarat has picked Bardoli, alongside four other towns near major cities, for satellite-town status, and the Surat Urban Development Authority covers it. The state government announced the plan in October 2025.
Under the state's description, a satellite town is one that can be reached from a major city within an hour.
Planning work covers land parcels, new town planning schemes and development plans, along with core infrastructure facilities. The estimated cost of developing these cities is still being assessed, as of November 2026.
In January 2026 the government invited urban planners to bid for the master plans, with a goal of giving these towns metro-like facilities by 2030. An initial fund of Rs 50 crore was allocated for the five-town programme.
Road link to Hazira port
The project road starts at the Gujarat and Maharashtra border and ends near Hazira Port. Its total length is about 131.8 km.
The road is split into three sections: the border to Bardoli (69.2 km), Bardoli through Palsana, Sachin and Magdalla to Ichhapore (46.6 km), and Ichhapore to Hazira (16 km).
The plan includes a realignment of the national highway between Bardoli and Ichhapore, along with two bypasses at Vyara and Bajipura.
The official project record gives a completion date of September 2012 and reports 16.32% physical progress as of March 2011. Those are the latest dated progress figures in that record.
Chennai-Surat highway plan
The six-lane Chennai-Surat national highway corridor under Bharatmala was first planned as a 1,271 km route costing around ₹50,000 crore.
In December 2025 the road ministry realigned the project to run from Chennai to Nashik, cutting its length to about 900 km.
Maharashtra's state road body is to build a greenfield road from Bharvir Khurd on the Samruddhi Expressway to Tawa village on NH-48, serving largely the same purpose as the dropped Surat-Nashik stretch. This stage is a proposal.
Bullet train at Surat
The first 50 km section, between Surat and Bilimora in Gujarat, is set to open in 2027, according to the railway minister. Later sections follow, covering Vapi to Surat, Vapi to Ahmedabad, and finally Thane to Ahmedabad.
The minister announced 15 August 2027 as the likely date for India's first bullet train.
By August 2026 the Surat station had reached a more advanced phase of construction. The bullet train station is at Antroli, in Surat.
Once the full line is running, the Mumbai to Ahmedabad trip is planned to take about two hours and seven minutes.
Surat Metro and proposed extension
Surat Metro Phase 1 covers 40.35 km across two corridors with 38 stations. The project is at the under-construction stage as of 2026.
The first trial run took place on 29 March 2026 on the 8.5 km stretch from Dream City to Althan Tenement. The project's construction page lists the first commercial section as expected by mid-2026, with full Phase 1 operation shown for December 2026 to 2027, data updated September 2026.
In May 2026 the metro corporation proposed a 4.4 km extension from Saroli to the Antroli bullet train station, with three new stations on the way.
The metro plans described here stay within Surat, and no metro line to Bardoli appears among them.
Port link
The Hazira road ends near Hazira Port, which gives the Bardoli road corridor a direct route to the port area. The project road runs from the Gujarat and Maharashtra border to the port.
Who is planning it
The Urban Development Department set up a high-level committee to fast-track infrastructure in these towns, which sit next to the state's five major cities.
The committee includes secretaries from tourism, sports, education, industry, employment, urban development, water supply and finance. Its job is to plan future infrastructure and keep growth balanced between the megacities and their satellite towns.
Frequently asked questions
Is Bardoli a notified satellite city?
Yes, Bardoli is one of five towns Gujarat has notified as satellite towns, and the notification was issued in October 2025. The towns are under the jurisdiction of their respective urban development authorities.
When will the bullet train start from Surat?
The first section, from Surat to Bilimora, is targeted to open in 2027, with 15 August 2027 given as the likely date. The minister said the 50 km Surat to Bilimora stretch will open in 2027.
Is Surat Metro running yet?
Surat Metro Phase 1 is still under construction, and its first trial run took place on 29 March 2026. The construction page shows full Phase 1 operation for December 2026 to 2027.
Which road links Bardoli toward Hazira port?
The Hazira-Bardoli project road runs from the Gujarat and Maharashtra border to near Hazira Port. Its official progress record shows 16.32% physical progress as of March 2011.
Does the metro reach Bardoli?
No metro line to Bardoli appears in the plans described here. The May 2026 proposal extends Surat's network to the Antroli bullet train station instead.
Does the Chennai-Surat highway still start in Surat?
No. The December 2025 revision starts the corridor at Nashik instead, and it now runs from Chennai to Nashik.
Sources
- Gujarat to develop five satellite towns around its major cities
- Gujarat govt starts Master Planning process for 5 Satellite Towns near major cities
- India's Satellite City List Expands As Gujarat Brings Five New Contenders
- Gujarat plans five new satellite towns to ease urban expansion
- Soma Isolux Surat-Hazira Tollway project document (Asian Development Bank)
- Surat-Chennai expressway curtailed; corridor to now start from Nashik
- First bullet train to run between Mumbai Ahmedabad on 15 August 2027, says Ashwini Vaishnaw
- Entire Mumbai-Ahmedabad section of bullet train project will open by 2029: Ashwini Vaishnaw
- India bullet train set for August 15, 2027 debut with phased rollout
- Mumbai-Ahmedabad bullet train nears completion as Surat station advances
- GMRC proposes linking Surat Metro Station to the Mumbai-Ahmedabad Bullet Train corridor
- Construction Progress and Project Updates - Surat Metro