New Cities India

Township Overview

Meerut New Township (Mohiuddinpur) — MEDA's Integrated TOD Township on Delhi Road

Meerut New Township is a Meerut Development Authority (MEDA) project on Delhi Road at Mohiuddinpur, built around a mixed-use, Transit-Oriented Development (TOD) model — Uttar Pradesh's first such township. As of mid-2026 it is in an active land-acquisition and planning-consultant stage, with a foundation stone already laid but plots not yet allotted.

Meerut New Township (Mohiuddinpur) — Meerut New Township (Mohiuddinpur) — MEDA's Integrated TOD Township on Delhi Road
Also known asMEDA Delhi Road Township; Meerut Delhi Road Housing Scheme; Integrated TOD Township
LocationMohiuddinpur, on Delhi Road (NH-58), Meerut district, UP
DeveloperMeerut Development Authority (MEDA)
Total footprint294 hectares across 31 sectors in two phases
Villages coveredMohiuddinpur, Chhajupur (Phase 1); Ikla, Daulatpur Fakhrabad alias Kayastha Gaongri (Phase 2)
Land bought so far~150 hectares purchased for ~₹1,086 crore (as of April 2026)
Estimated project value~₹2,500–2,570 crore (land cost alone estimated at ~₹2,516 crore)
State funding₹1,258 crore interest-free loan sanctioned; ₹809 crore released so far
Nearest RRTS stationMeerut South (Bhoodbaral) — about 1.5 km away
Status (as of July 2026)Foundation laid (2025); consultant tender for layout underway; plot allotment not yet started

What It Is

Meerut New Township is MEDA's flagship greenfield project at Mohiuddinpur on Delhi Road, promoted as Uttar Pradesh's first Integrated Transit-Oriented Development (TOD) township, being developed by MEDA on 294 hectares in Mohiuddinpur along Delhi Road, following a mixed-use model with residential, commercial, and industrial activities on different floors of the same buildings. The project is carried out in 31 sectors across two phases, and is designed to offer plots for all income groups — EWS, LIG, MIG, and HIG — for inclusive development.

Planning documents circulating in local press describe an eventual mix of housing, an IT/office zone, a medical college and consolidated government offices, though these remain proposals rather than confirmed, notified components.

Who Is Building It, and Why

The township is being built by the Meerut Development Authority (MEDA) under the state's Chief Minister's Urban Extension Scheme, which provides seed funding to development authorities for new townships. State budget coverage notes that Meerut is getting a new housing scheme after roughly 35 years, alongside similar first-in-decades schemes in Agra and Lucknow and a first industrial scheme in Bulandshahr, reflecting the scale of pent-up housing demand the project is meant to address for Meerut and the wider NCR periphery.

Officials have pitched it as a model for absorbing NCR overspill demand along the Delhi–Meerut corridor, generating employment, and modernising Meerut's urban form through mixed-use, transit-linked design rather than conventional single-use colonies.

Official Area, Villages and District

The township sits entirely within Meerut district, Uttar Pradesh, and is being assembled from four villages along Delhi Road: Mohiuddinpur, Chhajupur, Ikla and Kayastha Gaongri, adjoining the Ghaziabad border. Land-acquisition figures reported by MEDA in April 2026 show the purchase happening in two stages: 46 hectares in Mohiuddinpur bought for ₹418 crore and 21 hectares in Chhajupur for ₹81 crore in the first stage; 81 hectares in Daulatpur Fakhrabad, alias Kayastha Gaongri, bought for ₹587 crore in the second stage — together over 150 hectares for ₹1,086 crore, with fencing already done on the acquired plots. MEDA has indicated that roughly 144 hectares of additional land is still to be acquired to complete the full footprint.

Total planned area across both phases is consistently reported at 294 hectares (some earlier releases round this to 295–300 ha); a separate report on the Ikla–Kayastha Gaongri stretch alone put that portion at about 152.78 hectares, underlining that exact parcel-level figures have shifted slightly as acquisition has progressed.

Current Status (as of July 2026)

The project has moved from announcement to active execution but is not yet at the plot-sale stage:

No RERA registration, notified layout plan, or confirmed allotment date had been publicly issued as of July 2026.

Headline Connectivity

The site's main locational advantage is its position on Delhi Road (NH-58) close to Meerut's rapid-transit and expressway infrastructure:

What Happens Next

Three tracks are running in parallel and will determine how quickly the township becomes real for buyers:

  1. Consultant and layout finalisation — MEDA is selecting a Project Management Consultant to convert the drone-survey data into a sector-wise layout plan before any formal scheme notification or plot booking can open.
  2. Remaining land acquisition — with roughly half the planned area still to be purchased, particularly in Ikla and parts of Kayastha Gaongri, the pace of farmer agreements will directly affect how soon internal roads and services can start.
  3. Phased sector launch — MEDA's stated near-term goal is to complete infrastructure in the first two sectors and open plot sales there, before the rest of the 31-sector, two-phase township is rolled out over subsequent years; a long-range completion horizon extending toward 2031 has been mentioned in some local reports but is not yet an official MEDA target date.

Prospective buyers and residents of the affected villages should treat any current claims about plot prices, RERA numbers, or fixed possession dates as unconfirmed until MEDA issues a formal scheme notification.

Development phases

Phase 1Land purchase underway; layout consultant being appointed (2025–2026)Mohiuddinpur and Chhajupur villagesPhase 2Acquisition ongoing, notification pending on parts of the land (2025–2026)Ikla and Daulatpur Fakhrabad (Kayastha Gaongri) villages

Latest from Meerut New Township (Mohiuddinpur)

Frequently asked questions

What exactly is the Meerut New Township?

It is MEDA's project at Mohiuddinpur on Delhi Road, described as UP's first Integrated Transit-Oriented Development township, combining residential, commercial and industrial use on a single site.

Is 'MEDA Delhi Road Township' a different project?

No — MEDA Delhi Road Township and Meerut Delhi Road Housing Scheme are alternate names used in local coverage for the same Mohiuddinpur project.

Who is developing it?

The Meerut Development Authority (MEDA), with financial backing from the Uttar Pradesh government's Chief Minister's Urban Extension Scheme.

How big is the notified area and which villages are involved?

The project spans about 294 hectares across two phases, drawing land from Mohiuddinpur, Chhajupur, Ikla and Daulatpur Fakhrabad (Kayastha Gaongri) villages in Meerut district.

Has land acquisition been completed?

No. As of April 2026, MEDA had purchased just over 150 hectares of the roughly 294-hectare target, with about 144 hectares still to be acquired.

Can I buy a plot now?

Not yet. As of July 2026 the project is at the layout-consultant and land-acquisition stage; MEDA has targeted launching its first sectors around a coming Diwali, but no formal plot booking or RERA registration has been confirmed.

How will the township connect to Delhi and NCR?

Via Delhi Road (NH-58), the Delhi–Meerut Expressway, and the Meerut South RRTS/Namo Bharat station, which is about 1.5 km from the site.

Sources

Interested in Meerut New Township (Mohiuddinpur)?

Register once — get informed when projects, plot schemes or launches open up here.