Region overview
New Shillong Township: Plan, Status and Connectivity
New Shillong is a planned administrative, knowledge and institutional township being built beside Shillong, the capital of Meghalaya, to take pressure off the old city. It is developed by the New Shillong Township Development Authority, and its status as of November 2026 is Under Construction, with the Administrative City largely built and the Knowledge City at Mawkhanu still under development.

| Location | East Khasi Hills district, on the outskirts of Shillong, Meghalaya |
|---|---|
| Developer | New Shillong Township Development Authority (also searched as New Shillong Township Development Agency, NSTDA) |
| Land acquired | Over 915 acres, acquired between 1995 and 2017 (per the Chief Minister, July 2026) |
| Knowledge City land | 807.7 acres at Mawkhanu, covering tourism, hospitality, music, sports, IT and agriculture |
| Administrative Complex land | 229.724 acres allotted at Mawdiangdiang to the Urban Affairs Department |
| Total investment sanctioned | Over Rs 6,000 crore (as of March 2026) |
| Jobs target | About 1.5 lakh jobs (long-term target) |
| Status | Under Construction (as of November 2026) |
What New Shillong is
New Shillong Township, also written New Shillong Township or NST, is a planned twin city next to Shillong. The state government has designated it a growth centre for governance, education, innovation and economic activity. The aim is a modern administrative and knowledge city that decongests Shillong and supports growth with roads, water, power, public services and institutional zones.
The township spans several villages and localities, including Mawkhanu, Mawpdang, Mawdiangdiang, Umsawli and Tynring. Land has been acquired and allotted in stages over three decades rather than as one notified master area, so different official figures measure overlapping but not identical footprints.
Who is building it
The scheme was first conceived in the 1990s, when land was first acquired for a new township to relieve Shillong. The Meghalaya Urban Development Authority handled early land acquisition, survey and consultant appointments under the Meghalaya Town and Country Planning Act, 1973.
In 2013 the New Shillong Township Development Agency was set up, and implementation, finance management, land acquisition, allotment and infrastructure development were transferred to it. The agency works under the Department of Urban Affairs, Government of Meghalaya, alongside the Meghalaya Urban Development Authority and the ADB-funded NERCCDIP unit.
On 27 July 2026 the Meghalaya Cabinet approved amendments to the New Township Development Agency Rules, 2012, converting the agency into the New Shillong Development Authority (NSDA). The stated purpose is greater powers over urban planning, infrastructure development and governance in New Shillong.
Official area, villages and districts
New Shillong sits in East Khasi Hills district, on the outskirts of Shillong city. The core areas named in government notices on acquired land are Mawkhanu, Mawpdang, Mawdiangdiang, Umsawli and Tynring, as of August 2025.
- Administrative City (Mawdiangdiang and Umsawli): 229.724 acres allotted to the Urban Affairs Department at Mawdiangdiang for the Administrative Complex, and a 53-acre Secretariat site at Umsawli.
- Knowledge City (Mawkhanu): 807.7 acres acquired for the New Shillong Township Knowledge City (NSTKC).
- Wider township catchment: a detailed project report for water infrastructure covers the needs of 32 villages in and around the township.
Different statements cite different totals. The Knowledge City acreage, the core administrative acreage and the wider catchment are separate measures. An earlier figure from January 2024 put total state land for the New Shillong city project at about 1,700 acres.
Why it exists
Shillong was outgrowing itself. The township was planned to absorb the overspill population of the capital and allow growth. Shillong city's population now exceeds five lakh. The state's strategy has two parts: managing congestion, parking, water and drainage in old Shillong, while building New Shillong as the release valve for future expansion.
The Chief Minister has described the township as Meghalaya's future engine of growth, with a total investment of over Rs 6,000 crore and an expected 1.5 lakh jobs over the long term.
Current status as of November 2026
Progress was slow for a long time. A 2024 report based on an RTI reply found the township still in the development stage 29 years after land acquisition began. The state had by then spent over Rs 331 crore on land acquisition and collected Rs 83.07 crore in premiums from 38 departments allotted land there.
Momentum has picked up since then. In February and March 2026 the Chief Minister told the Assembly that Phase 1, the Administrative City, had emerged as a centre for administration, education and healthcare, housing the Meghalaya Secretariat (under construction), IIM Shillong, NIFT Shillong, NEIAH and NEIGRIHMS.
- Shillong Tech Park-II: inaugurated by the Chief Minister in late September 2026 at Umsawli. It adds 1.8 lakh sq ft of ready-to-occupy space at a cost of Rs 121 crore and was reported nearly fully booked within two days, with tenant agreements signed.
- Integrated Command and Control Centre: at New Shillong Township (Umsawli), reported in November 2026 as functioning well.
- New Assembly building (Mawdiangdiang area): the Speaker said on 13 October 2026 that the wings were complete, the main hall, dome and ceiling were still under work, and completion was targeted within 2026 with no cost increase. A safety audit ran alongside the work.
- Transmission line: on 27 July 2026 the Cabinet approved Rs 22.37 crore in land compensation for a 6.5 km, 132 kV line feeding a proposed 132/33 kV, 2x50 MVA Mawkhanu Substation.
On 30 July 2026 the Deputy Chief Minister inspected projects after the Chief Minister's office flagged slow progress. He reported most projects on track, a few slightly behind, a monsoon-hit working window of six to seven months, and no delay in funds from the government.
Connectivity
New Shillong connects to Shillong through the existing road network. Several regional roads are in the plan or in progress. A four-lane extension from Umiam to Shillong has been planned. The Shillong-Umroi airport road was reported in September 2025 as still far from completion. The Cabinet has approved a greenfield high-speed corridor from Shillong to Silchar. Power is being extended to the area through the 132 kV Mawkhanu substation project, and water supply planning covers 32 villages.
What happens next
The Chief Minister said on 4 November 2026 that the Administrative City is coming up quickly and projected that the Meghalaya Secretariat will move there between September and November 2027. The Secretariat complex costs Rs 1,188 crore.
The Assembly building is targeted for completion within 2026. The Knowledge City at Mawkhanu is the next large phase. Its roads, water, power and institutional buildings will decide whether the township reaches its job target over the long term.
For buyers and investors, the key questions are the pace of the Secretariat move, the Knowledge City timeline, and whether the finished buildings open for use. A Smart City review in November 2026 found the Integrated Command and Control Centre working well, while several other completed Smart City buildings in old Shillong were still not operational.
Anchor institutions already in place
IIM Shillong and NIFT Shillong function in New Shillong. NEIAH and NEIGRIHMS are cited by the Chief Minister as part of the Administrative City's education and healthcare base. The Meghalaya Secretariat and the new Assembly building are under construction. The Shillong Tech Park-II adds IT space for BPM and technology tenants.
Development phases
Latest from New Shillong
Frequently asked questions
Is New Shillong ready to move into?
New Shillong is Under Construction as of November 2026, with its Administrative City largely built and the Knowledge City at Mawkhanu still under development. Institutes such as IIM Shillong and NIFT Shillong already function in the area.
Where is New Shillong Township located?
New Shillong is in East Khasi Hills district, on the outskirts of Shillong, the capital of Meghalaya. Its core areas named in government notices are Mawkhanu, Mawpdang, Mawdiangdiang, Umsawli and Tynring.
Who is developing New Shillong?
The township is developed by the New Shillong Township Development Authority. It was set up in 2013 as the New Shillong Township Development Agency, and on 27 July 2026 the Cabinet approved converting it into the New Shillong Development Authority (NSDA).
How much land has been acquired for New Shillong?
The Chief Minister put the land procured for the township at over 915 acres, acquired between 1995 and 2017. Separately, 807.7 acres were acquired at Mawkhanu for the Knowledge City, and 229.724 acres were allotted at Mawdiangdiang for the Administrative Complex.
When will the Meghalaya Secretariat move to New Shillong?
The Chief Minister projected on 4 November 2026 that the Secretariat will move to the Administrative City between September and November 2027. The Secretariat complex is being built on a 53-acre site at Umsawli at a cost of Rs 1,188 crore.
What is the total investment planned for New Shillong?
The total investment sanctioned for the township is over Rs 6,000 crore, as of March 2026. The state expects the township to create about 1.5 lakh jobs over the long term.
Sources
- New Shillong (Wikipedia)
- New Shillong still in devp stage despite crores spent, The Shillong Times (4 October 2024)
- 229 acres of land allotted for setting up of Administrative Complex, Highland Post
- New Shillong Township to be state's growth engine: Conrad, Meghalaya Monitor
- New Shillong Township will be Meghalaya's engine of growth, says CM Conrad K. Sangma, Akashvani/Newsonair
- New Shillong City to generate over 1.5 lakh jobs
- Shillong-Umroi airport road project still far from completion, The Shillong Times
- Cabinet Approves Rs 22,864 Crore Shillong-Silchar Greenfield High-Speed Corridor, Swarajya
- 4-lane road extension from Umiam to Shillong set to become a reality, The Shillong Times
- Connectivity boost in New Shillong, The Shillong Times
- NSTDA Public Notice, land for CRPF Camp (Aug 2025)
- New Shillong to have industries?, Highland Post
- Official Website of Meghalaya Urban Development Authority
- Organisational Structure, Department of Urban Affairs, Government of Meghalaya
- Smart City projects ready but several remain unused, The Shillong Times (15 November 2026)
- Shillong Integrated Command and Control Centre inauguration, All India Radio North East
- Shillong gets 200 new parking slots as city shifts from banning to building
- Tech Park nears full occupancy within two days of inauguration, The Shillong Times
- Meghalaya Cabinet upgrades New Shillong Township body into powerful development authority, The Sentinel (28 July 2026)
- Corrections underway in new Assembly building after IIT-G flags minor issues, The Meghalayan Express (13 October 2026)
- Meghalaya Assembly Building Set for Completion, The Sentinel (October 2026)
- Meghalaya Cabinet approves land for New Shillong corridor, The Assam Tribune (14 November 2025)
- New Shillong Township Development Agency notice, Department of Urban Affairs, Meghalaya (12 March 2024)
- Shillong Tech Park-II Inaugurated, Adds 1.8 Lakh Sq Ft of IT Space, Ukhrul Times
- Meghalaya Chief Minister inaugurates Rs 121 crore 2nd IT Park, ThePrint
- Shillong's tech ambition gets a bigger address, Highland Post
- Shillong should emerge as Centre of Excellence for Northeast: CM, The Shillong Times
- ₹22.7 Crore approved for land compensation for 132 kV transmission project, Hubnetwork