Master Plan Snapshot

Meerut New Township (Mohiuddinpur) — Master Plan, Phases & Land Use

MEDA's Mohiuddinpur project — Uttar Pradesh's first Integrated Transit-Oriented Development (TOD) township — is planned across roughly 294–295 hectares in two phases and 31 sectors, with a detailed layout still being finalised as of mid-2026.

Meerut New Township (Mohiuddinpur) — Meerut New Township (Mohiuddinpur) — Master Plan, Phases & Land Use
Total footprint (village-wise total)~294–295 hectares across four villages (initially announced as ~300 ha)
Villages coveredMohiuddinpur, Chhajjupur, Ikla, Kayastha Gaondi
Phase structure2 phases, 31 sectors in total
Phase 1 land~141.88 ha (Mohiuddinpur 111.79 ha + Chhajjupur 30.09 ha)
Phase 2 land~152.78 ha (Ikla 21.97 ha + Kayastha Gaondi 130.81 ha)
Land purchased so far127 hectares (as of August 2025)
Planning/design horizon cited for layout consultantYear 2050 (per April 2026 tender notice)
Housing target~41,000 families / ~1.85 lakh residents
Estimated project value~Rs 2,500–2,570 crore (as reported Oct 2025 / June 2026)

What this project is

The Meerut New Township — referred to in official and press material as the MEDA Delhi Road Township, the Meerut Delhi Road Housing Scheme, or simply the "New Township" — is being built by the Meerut Development Authority (MEDA) in Mohiuddinpur, on Delhi Road near the Ghaziabad border. It is billed as the state's first scheme built on the principle of mixed land use, where shops, residences, offices and IT-linked industrial units sit on different floors of the same buildings. The site is close to the Meerut South RRTS/RapidX station (about 1.3 km), the Dedicated Freight Corridor (about 1.5 km), the Delhi–Meerut Expressway and Haridwar Bypass (about 2 km), Mohiuddinpur railway station (about 1.5 km), Partapur railway station (about 4 km), and roughly 10 km from Meerut city.

Total planned area vs. area targeted by near-term milestones

Two different figures have been used for the township's size, and it's important to separate them:

As of the last confirmed update, 127 hectares of land had been purchased, with acquisition continuing in Mohiuddinpur, Chhajjupur, Ikla and Kayasth Gaondi villages (position as of August 2025). This is the land actually in MEDA's hands, not the full notified footprint — buyers and researchers should not treat "294 ha planned" as "294 ha ready."

Phasing: hectares and target years

The township is split into two development phases, further broken into sectors:

Note on status: these are the milestones reported through August–October 2025. No independently confirmed public update on whether the November 2025 target or Diwali 2025 plot-sale launch was actually met has been found; this page will be updated when firmer confirmation is available.

Planning horizon and who is preparing the layout

Unlike the city-wide Meerut Master Plan 2031 (see below), the New Township's own detailed layout was still being commissioned in 2026. MEDA invited applications for the appointment of a Project Management Consultant (PMC) to prepare the layout plan and manage in-colony development, with a pre-bid meeting held at the MEDA office on 15 April. Coverage of that tender describes the scheme as a 294-hectare mixed-use township planned with a horizon year of 2050, and states that the selected firm will study population, real estate trends, land value, economic conditions and surrounding development as part of preparing the plan — i.e., as of April 2026, the granular sector-level master plan (roads, plot sizes, exact land-use zoning) was not yet finalised; MEDA had only fixed the broad phase/sector skeleton (2 phases, 31 sectors, ~294–295 ha).

No named external planning/consultancy firm for this specific township had been publicly confirmed as of the research date; MEDA officials quoted in coverage (Vice-Chairman, Secretary, Chief Town Planner) are authority officials, not the appointed layout consultant.

Land use and design concept

No official percentage-wise land-use split (e.g., X% residential, Y% industrial) specific to this township has been published; MEDA has so far described the concept qualitatively rather than as a notified zoning table. Reported features of the concept include:

Because no quantified land-use table for this specific project could be verified, this page does not present a land-use percentage chart — doing so would risk fabricating numbers.

Population and employment targets

In a presentation to the state government, MEDA indicated the township would house about 1.85 lakh (185,000) people, accommodating around 41,000 families. Authority officials have also linked the project to wider regional housing demand: the 300-hectare-scale township (as originally conceived) was targeted at meeting about 8% of NCR's residential housing need. On the jobs side, MEDA's Vice-Chairman stated that the mixed land-use approach would mean while 1.85 lakh families could reside there, around 2.5 lakh people would also work there.

Budget and funding reported so far

Funding figures have been announced in stages rather than as one fixed capital-cost figure:

These figures are not all directly comparable — some cover only land purchase, others cover budget sanctions, and the Rs 2,500–2,570 crore figure appears to be a broader project-value estimate from trade/industry trackers rather than an MEDA-published capital cost. Treat them as separate, not additive.

How this fits into Meerut's city-wide Master Plan

The Mohiuddinpur township sits inside — but is a distinct, named scheme from — MEDA's city-wide document. The Meerut Masterplan 2031 is the operative land-use plan for Meerut's development area, notified by MEDA under the UP Urban Planning and Development Act, 1973, approved on 24 January 2024, and covering roughly 1,043 sq km across 305 villages. It is also the first masterplan in India to formally embed Transit-Oriented Development (TOD) zones. Under that plan, MEDA has earmarked about 3,273 hectares for TOD — roughly 2,442 hectares across seven TOD zones around the RRTS and Meerut Metro corridors, with the remainder inside two Special Development Areas. The Mohiuddinpur/New Township scheme is the flagship project being delivered under this TOD policy and the state's "Mukhyamantri Shahri Vistarikaran Yojana" (Chief Minister's Urban Expansion Scheme), but it has its own separate layout process (see planning-horizon section above) rather than being a single sector inside Master Plan 2031's own zoning tables.

Where to find official documents

MEDA publishes master plan, sector-layout and scheme information on its official site. For the city-wide Master Plan 2031 and general sector layouts, check the Master Plan and Scheme Layout pages on mdameerut.in. For the Mohiuddinpur/New Township scheme specifically — including any future tender documents, the appointed layout consultant's report, and sector-wise plot lists once notified — check MEDA's tenders/notices sections on the same site, since a dedicated public project page for this township was not found as a stable, citable URL at the time of research. Always verify a scheme's sanctioned-layout status directly with MEDA before transacting, since unauthorised colonies remain a documented issue in Meerut.

Development phases

Phase 1villages notified; construction milestones targeted Aug–Nov 2025~141.88 ha (Mohiuddinpur 111.79 ha + Chhajjupur 30.09ha); 60 ha targeted for initial works; 127 ha purchasedoverallPhase 2notification pending as of the most recent confirmed report~152.78 ha (Ikla 21.97 ha + Kayastha Gaondi 130.81 ha)

Frequently asked questions

How big is the Meerut New Township at Mohiuddinpur?

The village-wise total works out to roughly 294–295 hectares across four villages (Mohiuddinpur, Chhajjupur, Ikla, Kayastha Gaondi); earlier announcements had rounded this to about 300 hectares.

Is this the same as MEDA's Master Plan 2031?

No. Master Plan 2031 is the city-wide land-use plan for Meerut's roughly 1,043 sq km development area, approved January 2024. The Mohiuddinpur township is a specific TOD-policy project developed within that broader framework, with its own separate layout-planning process.

What planning horizon (target year) is being used for the township's own layout?

Coverage of MEDA's April 2026 consultant tender for the township's layout plan cites a horizon year of 2050 for this specific scheme.

Which villages' land is being used?

Mohiuddinpur, Chhajjupur, Ikla and Kayastha Gaondi. Mohiuddinpur and Chhajjupur form Phase 1; Ikla and Kayastha Gaondi form Phase 2.

How many sectors will the township have?

Thirty-one sectors in total, split across the two phases.

Has a detailed master layout (roads, plot sizes, land-use zoning) been finalised?

Not as of the most recent confirmed reporting. MEDA was still in the process of appointing a Project Management Consultant to prepare the detailed layout plan as of April 2026.

What population and jobs is the project targeting?

MEDA's own presentation to the state government cited about 1.85 lakh residents in roughly 41,000 families, with officials separately estimating around 2.5 lakh people working within the township.

Sources