New Cities India

Connectivity and Transport

Hirasar Satellite City: Connectivity, Airport and Road Links

Hirasar, a village near Rajkot in Gujarat, is the site of Rajkot International Airport, which has handled scheduled flights since 10 September 2023, and it is one of five satellite towns the state announced in October 2025. As of November 2026, road is the main link to Rajkot, while a metro for the city remains a proposal (last reported September 2024).

Hirasar — Hirasar Satellite City: Connectivity, Airport and Road Links
AirportRajkot International Airport at Hirasar; scheduled flights from 10 September 2023; operational as of November 2026
Distance to Rajkot cityAbout 36 km, beside the Rajkot–Ahmedabad highway near Chotila (as reported September 2023)
Bus linkGSRTC shuttle buses from Rajkot bus port, every two hours (from September 2023)
Ahmedabad–Rajkot highwaySix-laning under way; 98% of the first phase complete (as of March 2025)
Rajkot metroProposed: 39 km route at about ₹10,000 crore; submitted to the Union government (as of September 2024)
Satellite town statusHirasar named a satellite town in October 2025; master planning at tender stage (as of January 2026)
Development authorityGujarat Urban Development Department

Air access: Rajkot International Airport

Rajkot International Airport at Hirasar was inaugurated by Prime Minister Narendra Modi in the last week of July 2023. Scheduled flights moved to the new site from 10 September 2023, and the old Rajkot airport stopped scheduled services the day before. Status as of November 2026: operational.

A September 2023 report placed the airport about 36 km from Rajkot city, beside the Rajkot–Ahmedabad highway near Chotila. That distance is the main trade-off for travellers used to the older airport inside the city, so drivers and buyers should allow extra travel time.

Road links to Rajkot and Ahmedabad

The Gujarat State Road Transport Corporation started regular buses from the Rajkot bus port to the airport on 10 September 2023. Buses start from 6 a.m. and run at two-hour intervals.

The Ahmedabad–Rajkot highway is being widened into a six-lane road. A March 2025 statement in the state Assembly said the state would invest ₹3,350 crore, that 197 km of a 201.33 km stretch forms the first phase, and that 98% of that phase was complete. Once finished, the Ahmedabad–Rajkot trip is expected to take 2 hours 32 minutes, a saving of 30 to 45 minutes.

Earlier plans for the same corridor were set out in 2017, when the total conversion cost was put at ₹2,500 crore, including a 7 km Chotila bypass at ₹112 crore and flyovers at Limdi, Bagodara and Sayla. A 2014 environmental brief for the NH-8A and NH-8B sections also proposed six-laning the Bamanbore–Rajkot stretch with a bypass near Chotila.

Metro proposal for Rajkot

The Gujarat government has submitted a proposal to the Union government for a metro rail system in Rajkot, according to a September 2024 report. The plan covers a 39 km route at an estimated cost of ₹10,000 crore, and survey work had already been carried out. Construction would begin only after central approval, and if approved it would be the first metro in the Saurashtra region. Status as of September 2024: proposed.

No metro station has been linked to the airport in any plan reported so far, so Hirasar buyers should treat rail-based access as a future option rather than a current one.

Satellite town plan and internal roads

The state government named Hirasar, along with Sanand, Savli, Kalol and Bardoli, as a satellite town, with the planning notice issued in October 2025. A satellite town is defined as a place reachable within about an hour from a major city. Planning consultants were invited in January 2026 to prepare master plans, and the state aims to give these towns metro-like facilities by 2030.

The infrastructure listed for the satellite towns includes electric bus services, modern water and waste systems, ring roads, urban forest parks, lakes, model fire stations and mixed-use zones combining offices, housing and shops. The internal road layout for Hirasar will be set through the master plan process, which was still at the tender stage in January 2026.

Travel times at a glance

LinkDistance or timeStatus
Rajkot city to Hirasar airportAbout 36 kmOperational since September 2023
Rajkot to airport by GSRTC busTwo-hourly serviceOperational since September 2023
Ahmedabad to Rajkot by road2 hours 32 minutes after six-laningUnder construction; 98% of first phase complete (March 2025)
Rajkot metro39 km routeProposed (September 2024)

Who is planning Hirasar

The Gujarat Urban Development Department is the body behind the satellite town programme. The state describes it as part of the Urban Development Year 2025 vision of Earning Well–Living Well, with the goal of reducing pressure on major cities by developing planned towns nearby. Each town is meant to build its own economic base and employment, so the connectivity of Hirasar to Rajkot and Ahmedabad is central to that aim.

For buyers, the practical picture is this: an operating airport and a six-laning highway in progress are the current links, while the metro, ring roads and the full master plan belong to later stages. Plans for the satellite towns are still at the planning stage, so timelines should be read as targets rather than commitments.

Frequently asked questions

How far is Hirasar from Rajkot city?

Hirasar, where Rajkot International Airport is located, sits about 36 km from Rajkot city, beside the Rajkot–Ahmedabad highway near Chotila, according to a September 2023 report.

When did flights start at the Hirasar airport?

Scheduled flights moved to Rajkot International Airport at Hirasar on 10 September 2023, after the Prime Minister inaugurated it in late July 2023.

Is there a bus service from Rajkot to the Hirasar airport?

Yes, GSRTC runs regular buses from the Rajkot bus port to the airport, starting at 6 a.m. and running every two hours.

Is there a metro to Hirasar?

No metro is operating; Rajkot's metro is a proposal, with a 39 km route submitted to the Union government as of September 2024.

When will the Ahmedabad–Rajkot highway be six-laned?

The six-laning is under construction, and 98% of the first phase was complete as of March 2025, according to a statement in the state Assembly.

Is Hirasar a satellite town now?

Hirasar was named one of five satellite towns by the state government in October 2025, and master planning was at the tender stage as of January 2026.

Sources

Interested in Hirasar?

Register once — get informed when projects, plot schemes or launches open up here.