Savli (Vadodara) satellite city is one of five towns Gujarat has notified as satellite towns beside its major cities, with the Vadodara Urban Development Authority holding jurisdiction. Its road links rest mainly on the Delhi–Mumbai Expressway, with the package ending near Savli reported complete in November 2024, while the Vadodara metro that would serve the wider city remains a proposal in 2025 reports.

Savli — Savli Satellite City: Connectivity, Roads and Rail
StatusNotified satellite town (notification October 2025); master plans being prepared, as of November 2026
Development authorityGujarat Urban Development Department; Vadodara Urban Development Authority holds jurisdiction
ExpresswayDelhi–Mumbai Expressway package 31 (19 km) ends at Pratapnagar near Savli; Godhra–Vadodara stretch open on trial basis from 13 April 2026
MetroVadodara metro proposed, about 40 km, estimated ₹11,000 crore (2025 reports); awaiting central approval
Freight railWestern Dedicated Freight Corridor, 1,504 km from JNPT to Dadri via Vadodara (route data last updated September 2022)
Initial fund₹50 crore allocated for the first phase across the five satellite towns (November 2025 report)
TargetMetro-like facilities in the satellite towns by 2030, per the state government

Expressways and highways near Savli

The Delhi–Mumbai Expressway passes close to Savli. Package 31 of the Vadodara–Delhi section is a 19 km stretch that starts at the Vadodara–Ahmedabad NE-1 interchange and ends at Pratapnagar, near Savli. A November 2024 report put that package at around 100% complete, with the entry and exit roads at NE-1 finished.

The Godhra to Vadodara stretch, covering Packages 29 to 31 over 64 km, opened to traffic on a trial basis from 13 April 2026, according to an April 2026 report.

As of 7 August 2026, most packages of the 432 km Vadodara–Mumbai section were reported completed and open, with work continuing on the remaining stretches. An April 2026 report projected that three pending packages between Gandeva and Vapi would be finished by April 2028.

On the Maharashtra side, the 157 km stretch was scheduled in June 2026 to open by 31 August 2026. The Maharashtra chief minister said the route would cut Mumbai–Vadodara travel from about eight hours to about four.

Rail and freight corridor

The Western Dedicated Freight Corridor is the main dedicated freight rail line in the wider region. Its route covers 1,504 km of double-line electric track from JNPT near Mumbai to Dadri, passing through Vadodara and Ahmedabad, according to a route description last updated in September 2022.

The Vadodara junction linking the freight line to the existing rail network is at Makarpura. Traffic on the corridor is mainly containers moving from Mumbai-area and Gujarat ports to inland terminals in northern India.

Vadodara metro proposal

Vadodara's metro is a proposal, not an operating line. The plan covers about 40 km at an estimated cost of ₹11,000 crore, and its detailed project report was sent to the Union government in 2025 after approval by the state government.

Gujarat expects the Centre to fund half the cost. Work would begin only after the Centre sanctions the funds, according to officials quoted in the 2025 report.

The first corridor is described as linking industrial zones, Alkapuri, Akota and the Vadodara airport. A second corridor would run from the old city to the GSFC industrial area via the railway station. Savli is not one of the named points on either corridor.

Satellite town plan and road network inside the plan

The Gujarat Urban Development Department notified Savli, along with Kalol, Sanand, Bardoli and Hirasar, as satellite towns in October 2025. Each town sits under its own urban development authority, and Savli falls under the Vadodara authority.

In early 2026 the state invited urban planners to prepare master plans. A consultant was to be appointed within two months, with each master plan finished within one year.

The planned work covers land parcels, new town planning schemes and development plans, along with core infrastructure. The estimated cost of developing the five towns was still being assessed as of November 2026.

Each satellite town is to receive modern transport, industry, education and healthcare facilities under the plan. The state government aims to provide metro-like facilities by 2030, and an initial fund of ₹50 crore was allocated for the project.

Why the connectivity matters for the area

The state defines a satellite town as a place reachable within about one hour from a major urban centre. The programme is meant to ease population and infrastructure pressure on Vadodara and to create new economic and employment hubs closer to the city.

Savli is also part of the wider Vadodara district economy, where industrial estates and export-oriented projects already operate, so road and rail links carry more weight for freight and commuting than for leisure travel.

Checking the current status of links

Road and rail dates on this corridor have moved several times since 2024. Confirm the opening status of any link with the highway authority or the freight rail operator before relying on it for a commute or a property decision.

Frequently asked questions

Is Savli a notified satellite town?

Yes. The Gujarat government notified Savli as one of five satellite towns in October 2025, with jurisdiction under the Vadodara Urban Development Authority.

Is the Delhi–Mumbai Expressway open near Savli?

The Godhra to Vadodara stretch has been open to traffic on a trial basis since 13 April 2026. Package 31, which ends at Pratapnagar near Savli, was reported around 100% complete in November 2024.

Is there a metro in Savli?

No metro runs in Savli. The Vadodara metro is a proposal of about 40 km at an estimated ₹11,000 crore, and its detailed project report was sent to the Union government in 2025.

When will the Savli satellite town master plan be ready?

The state planned to appoint a consultant within two months and finish the master plan within one year, according to a January 2026 report.

Is there a freight rail line near Savli?

The Western Dedicated Freight Corridor runs through Vadodara on its 1,504 km route from JNPT to Dadri. The Vadodara junction listed for it is Makarpura.