Land Allotment
MITL Offer Letter: Godawari Power & Ispat Land Allotment at AURIC Bidkin (31.45 acres, Plot 43, Sector 25)
Godawari Power and Ispat received an Offer Letter from Maharashtra Industrial Township Limited for an industrial plot measuring about 31.45 acres at the AURIC Bidkin Industrial Area in Chhatrapati Sambhaji Nagar, Maharashtra. The Offer Letter was issued on September 22, 2026, and received on September 24.

| Issuing Authority | Maharashtra Industrial Township Limited (MITL) |
|---|---|
| Offer Letter Date | September 22, 2026 |
| Date Received | September 24, 2026 |
| Beneficiary | Godawari Power & Ispat Limited |
| Plot Identification | Plot No. 4-3, Sector No. 25, admeasuring 127,285.98 square metres (approximately 31.45 acres) |
| Location | AURIC Bidkin Industrial Area, District Chhatrapati Sambhaji Nagar, Maharashtra |
| Intended Use | Setting up a CRM (Copper Rod Mill) project |
| Price/Financial Terms | Not disclosed in public filing |
| Project Status | Land allocation (Offer stage; not yet formally allotted) |
Authorising Body and Context
Maharashtra Industrial Township Limited (MITL) is a Special Purpose Vehicle between Maharashtra Industrial Development Corporation (MIDC) and National Industrial Corridor Development Corporation (NICDC). MITL has the mandate to undertake the development of all industrial nodes coming under the Delhi Mumbai Industrial Corridor (DMIC) and NICDC Programme in Maharashtra.
AURIC has a total area of 10,000 acres spread across the Shendra and Bidkin areas near Aurangabad. The Shendra node is 2,000 acres and the Bidkin node is 8,000 acres. 60% of land in Auric is zoned for industrial use, while the remaining 40% is zoned for residential and commercial use, as well as public spaces, and social and cultural amenities.
The Offer Letter Decision
MITL issued an Offer Letter dated September 22, 2026, which was received by Godawari Power and Ispat Limited on September 24, 2026. This is a formal offer—not yet a binding allotment agreement—but represents MITL's decision to reserve the specified plot for the company's industrial use.
The offer is documented and subject to further contractual formalities. The offer represents a land allocation opportunity at this stage.
Plot Specifications and Boundaries
The plot is identified as Plot No. 4-3, Sector No. 25, with an area of 127,285.98 square metres, equivalent to approximately 31.45 acres, situated at AURIC Bidkin Industrial Area, District Chhatrapati Sambhaji Nagar, Maharashtra.
No detailed boundary coordinates, survey numbers, or subdivision details were disclosed in the public filing, in line with standard stock exchange disclosure norms.
Intended Industrial Purpose
The company plans to use the industrial land for setting up a CRM (Copper Rod Mill) project. The company has not provided further project details, including proposed investment, capacity, implementation timeline or expected commercial contribution from the project in the disclosure.
Practical Effect as of September 2026
This Offer Letter represents MITL's administrative decision to offer the specified plot to Godawari Power & Ispat for industrial development under the DMIC framework. As of September 2026, the decision effect is:
- Plot reserved for the applicant company subject to acceptance and execution of formal allotment agreement
- No public pricing, terms of payment, or development conditions disclosed at offer stage
- Company must respond to the offer within a timeframe specified in the original letter (not disclosed in stock exchange filings)
- Formal possession and title transfer contingent on execution of full allotment deed and compliance with MITL's industrial township norms
MITL's authority to issue this offer derives from its role as development and land administration authority for AURIC under the joint MIDC–NICDC structure.
Regulatory Filing and Transparency
This offer was disclosed to the BSE and NSE by Godawari Power & Ispat pursuant to Regulation 30 and other applicable provisions of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015. The company, being listed, is required to inform stock exchanges of material corporate events, of which a land acquisition opportunity qualifies.
Land use
Frequently asked questions
What is an 'Offer Letter' in the context of industrial land allotment at AURIC?
An Offer Letter from MITL is a formal notification that the authority has identified and reserved a specific industrial plot for a qualifying applicant. It precedes the formal allotment agreement and indicates MITL's willingness to allocate the land subject to the applicant's acceptance and compliance with terms.
Who is Godawari Power & Ispat, and why did they apply for land at AURIC Bidkin?
Godawari Power & Ispat Limited is a publicly listed integrated steel and power company. The company sought the AURIC plot to establish a Copper Rod Mill (CRM), expanding its metal processing operations in a strategically located industrial zone in Maharashtra.
What does CRM project stand for?
CRM stands for Copper Rod Mill—an industrial facility for processing, drawing, and manufacturing copper rods, typically used in electrical and construction applications.
Why is this offer significant for investors?
The land, located in the AURIC Bidkin Industrial Area, supports the company's metals sector strategy. For regional investment, it indicates continued industrial activity and private sector confidence in AURIC as a manufacturing destination.
When will the land be formally allotted and possession handed over?
The Offer Letter does not specify dates for formal allotment or possession. These timelines are typically outlined in the detailed allotment agreement that follows acceptance of the offer and would depend on clearance of legal, environmental, and infrastructural prerequisites set by MITL.
Is the price of the land public?
The filing did not disclose the financial consideration associated with the land offer. Industrial land pricing at AURIC is typically determined by plot size, location, sector zoning, and infrastructure readiness, and is often confidential until final agreement.
Sources
- Business Standard: Godawari Power acquires 31.45-acre land at AURIC Bidkin Industrial, Maharashtra
- HDFC Sky: Godawari Power Gets 31.45-Acre AURIC Land Offer
- BSE Filing: Godawari Power & Ispat Offer Letter Intimation (22 Sept 2026)
- Angel One: Godawari Power Share Price in Focus; Secures Industrial Land
- 5Paisa: Godawari Power & Ispat Share Price
- Screener: MITL offered 31.45-acre land at AURIC Bidkin for GPIL's CRM project
- Wikipedia: Aurangabad Industrial City (AURIC)
- Official AURIC Website
- The Week: AURIC – Aurangabad Industrial City
- PIB: Prime Minister Modi Dedicates Bidkin Industrial Area to the Nation
- Maharashtra Government Industry Department: MITL