New Cities India

Budget and Planning

Hirasar Near Rajkot Joins Gujarat's Satellite Town Plan, Setting Up Land, Road and Transit Planning

Gujarat's 2026-27 state budget names Hirasar, near Rajkot, as one of five satellite towns to be linked by a proposed Regional Rapid Transit System. As of November 2026 the area is at the planning stage, with master plans and town planning schemes still to be prepared.

Hirasar — Hirasar Near Rajkot Joins Gujarat's Satellite Town Plan, Setting Up Land, Road and Transit Planning
Budget announcementGujarat Budget 2026-27, reported 19 February 2026
Satellite towns namedSanand, Kalol, Savli, Bardoli and Hirasar
Proposed transit linkRegional Rapid Transit System (RRTS) connecting the five towns
Planning authorityRajkot Urban Development Authority (RUDA), under the Urban Development Department, Gujarat
Distance from RajkotAbout 35 km from Rajkot city (as of November 2026)
Current stageUpcoming: master plan and town planning schemes to be prepared (as of November 2026)
AirportRajkot International Airport at Hirasar, new terminal operating since February 2025
Statewide budget linesRs 200 crore smart parking and traffic systems; Rs 350 crore railway overbridges and underpasses; Rs 180 crore integrated command and control centres in 12 municipal corporations

What the 2026-27 budget announced

The Gujarat state budget for 2026-27 sets out plans to develop five satellite towns beside the state's major cities. Hirasar is one of them, alongside Sanand, Kalol, Savli and Bardoli. The budget says the towns will be connected through a proposed Regional Rapid Transit System, with the stated purpose of improving connectivity and supporting decentralised urban growth.

A satellite town, as the state defines it, is a town reachable within about an hour from a major city. The idea is to take some population and economic activity pressure off the metros, lower the cost of living and spread civic amenities more evenly across the region.

Budget money for transport and civic systems

The same budget sets aside Rs 200 crore for smart parking and traffic systems, Rs 350 crore for railway overbridges and underpasses, and Rs 180 crore for integrated command and control centres in 12 municipal corporations. These are statewide urban allocations. They are not a Hirasar-specific sum, but they show the kind of road and traffic investment the state expects to support as its towns grow.

An initial fund of Rs 50 crore was earlier allocated for the five satellite towns as a group, after the state set up a high-level committee in November 2025 to fast-track their infrastructure.

Where the planning stands

The state government notified the five satellite towns in October 2025. Hirasar falls under the Rajkot Urban Development Authority, which will prepare the town planning schemes and master plan for the area. In January 2026 the government invited urban planners with national and global expertise to submit proposals, and a consultant was expected to be appointed within about two months of that call. The master plans are to be finalised within one year of the consultant's appointment.

Planned infrastructure for the towns includes urban transport such as Metro and BRTS, interlinking highways with green corridors to the metropolitan centres, and modern industry, tourism, education and healthcare facilities. Until the master plan is approved, the land use and layout of the area remain at the planning stage.

Airport and the Rajkot link

Hirasar already has a major piece of transport infrastructure. The Rajkot airport at Hirasar village was inaugurated on 27 July 2023 and was built by the Airports Authority of India at a reported cost of Rs 1,405 crore. The airport covers about 1,500 acres, and its new terminal has been operating since February 2025. Airlines moved their operations from the older Rajkot airport to Hirasar from 10 September 2023.

On 9 November 2026 the Union Home Ministry added the Hirasar airport to the list of authorised immigration posts through a Gazette notification. The clearance lets the airport handle international passengers once airlines and operators set up services. It does not by itself fix any overseas route.

What comes next for land and jobs

The next steps are the appointment of the planner, the preparation of the master plan and town planning schemes, and the detailed route and stations of the proposed RRTS. Together these decide which land is opened for housing, industry and services, and how quickly the road and rail links to Rajkot are built.

For buyers and investors, the key point is that Hirasar is at the planning stage. Its growth depends on the approved master plan, RUDA's approvals and the pace of transport works. Anyone considering land or homes in the area should check the final plan and approved layouts before committing.

Frequently asked questions

Is Hirasar one of the satellite towns in the Gujarat budget 2026-27?

Yes, the Gujarat state budget for 2026-27 names Hirasar among five satellite towns, along with Sanand, Kalol, Savli and Bardoli.

Which authority is planning Hirasar?

The Rajkot Urban Development Authority (RUDA) is the planning authority for Hirasar, under the Urban Development Department of the Gujarat government.

What is the current stage of the Hirasar satellite town?

As of November 2026 the status is Upcoming: the master plan and town planning schemes are still to be prepared.

How far is Hirasar from Rajkot city?

Hirasar is about 35 km from Rajkot city, as of November 2026.

Is the Hirasar airport operating?

Yes, the Rajkot International Airport at Hirasar has been operating since its 2023 opening, and its new terminal has been operating since February 2025.

Does the budget allocate money directly for Hirasar?

The budget's Rs 200 crore, Rs 350 crore and Rs 180 crore lines are statewide urban allocations. The five satellite towns, Hirasar included, received an initial Rs 50 crore fund after the November 2025 committee was set up.

Sources

Interested in Hirasar?

Register once — get informed when projects, plot schemes or launches open up here.