NICDC Issues Notice to Proceed for Common Infrastructure Works at Orvakal Industrial Area
On 30 October 2025, the Andhra Pradesh Industrial Corridors Infrastructure Development Corporation (APICDC) — the state-central special purpose vehicle under NICDC — signed the EPC contract agreement for trunk (common) infrastructure works at the Orvakal Industrial Area in Kurnool district, formally moving the project from tendering to construction mobilisation.

| Decision | EPC contract agreement / Notice to Proceed for Common Infrastructure Works signed |
|---|---|
| Date of decision | 30 October 2025 |
| Deciding/executing body | AP Industrial Corridors Infrastructure Development Corporation (APICDC), SPV of NICDIT & APIIC, under NICDC oversight |
| Contractor | M/s GVPR Engineers Ltd |
| EPC contract value (LOA) | ₹1,197 crore (LOA issued 9 Oct 2025) |
| Total project cost (IIG tracker) | USD 350.31 million |
| Scheduled completion | 30 October 2028 |
| Area covered | Phase 1 Activation Area, 2,621 acres (10.61 sq km) |
| Land transferred to SPV so far | 1,292 acres, with matching equity of ₹500 crore released by NICDIT |
| Corridor | Hyderabad–Bengaluru Industrial Corridor (HBIC) |
What was decided
The India Investment Grid (IIG) project tracker records a Central Government project titled "Common Infrastructure for Industrial Parks" at Orvakal, Kurnool, moving to Notice to Proceed status on 30 October 2025, with a project window running to 30 October 2028 and a total project cost listed as USD 350.31 million.
This tracker entry corresponds to a specific contractual event: NICDC's programme documentation shows that for the Orvakal Node, an EPC tender for trunk infrastructure works was floated by the SPV on 28th Apr 2025 and LOA has been issued to M/s GVPR Engineers Ltd on 9th Oct 2025 for ₹1,197 Cr, with the EPC Contract Agreement executed between M/s GVPR Engineers Ltd and APICDC (SPV) on 30th Oct 2025. The 30 October 2025 date is the point at which the contractor was cleared to begin site mobilisation and design work — the practical meaning of "Notice to Proceed" in this context.
Which body took the decision
The contracting authority is the project Special Purpose Vehicle, not NICDC directly. The SPV — originally set up for Krishnapatnam — was incorporated on 7 August 2018 with equal equity of APIIC (GoAP) and NICDIT (GoI); its mandate, earlier limited to Krishnapatnam, was expanded to Orvakal and Kopparthy through an SSA/SHA amendment dated 30 October 2024, after which it was subsequently renamed "AP Industrial Corridor Infrastructure Development Corporation."
Ahead of the EPC award, the SPV had already appointed a Programme Manager for New Cities: LOA issued by SPV for Programme Manager for New Cities (PMNC) on 27th March, 2025, with Haskoning DHV holding that role. The tender for the trunk-infrastructure EPC contractor was floated under Tender Notice covering "PROGRAMME MANAGER FOR NEW CITIES (PMNC) FOR INFRASTRUCTURE DEVELOPMENT OF ORVAKAL INDUSTRIAL AREA AT KURNOOL DISTRICT IN ANDHRA PRADESH UNDER HYDERABAD BENGALURU INDUSTRIAL CORRIDOR (HBIC)" issued by APICDC.
Operative details: area, cost and boundaries
The works apply to the Phase 1 "Activation Area" of the Orvakal Node. Programme documents describe the node's overall scale and phasing: a consultant for Detailed Master Planning and Preliminary Engineering for the Orvakal Node, 9,305 Acre, was appointed in January 2021, wherein GoAP proposed 4,742 Acre of land to be developed under the NICDIT framework, out of which 2,621 Acre was proposed as Phase 1 Activation Area (2,346 Acre already in possession of the State Govt.). Environmental clearance for this first cluster was obtained earlier: EC for the Phase 1 Guttapadu Cluster was granted by MoEF&CC on 11th November 2020.
The technical scope tendered for the EPC works includes internal road networks, sewerage and effluent systems, and power infrastructure. Specifications call for 30m ROW roads proposed as dual carriageway with a narrow median, featuring walkway, cycle track, utility corridor and drains, with the sub-arterial road running approximately 17.53 km, plus approximately 35.92 km of HDPE pipeline for effluent and sewage collection from industrial plots, conveying it to a Common Effluent Treatment Plant. The activation area itself is formally demarcated: the survey scope covers the complete boundary of 10.61 sq km, to be marked with permanent boundary stones engraved "APIIC OIA".
On land and funding progress, by the latest available programme update, 1,292 acres of land had been transferred by the State government to the Project SPV, with matching equity amounting to ₹500 crore released, and a 300-acre area in the southern part of the site has been designated for a 'Drone City'.
Practical effect and what happens next
Following the contract signature, work moved from paperwork to physical mobilisation. Programme reporting confirms that site establishment works, C&G Works, and design preparation were initiated by the EPC contractor, and a formal kick-off meeting for the EPC contract for the Orvakal and Kopparthy Industrial Areas was held under the chairmanship of the CEO & MD, NICDC, on 24th December 2025.
The award follows a high-profile ground-breaking: the launch followed the foundation stone laying of the Kopparthy and Orvakal Industrial Nodes by the Prime Minister on 16 October 2025. Separately, the Drone City component within Orvakal has been publicly launched: the Union Commerce Minister announced the launch of India's first Drone City at Orvakal, an initiative expected to generate over 40,000 jobs and house the world's largest common drone testing facility.
For investors and local stakeholders, this Notice to Proceed means the trunk-level roads, sewage/effluent network and power infrastructure for the first 2,621-acre activation area are now under active construction rather than tendering — a precondition for plot-level industrial allotments to begin. As of January 2026 reporting, this remains a construction-stage project; it is not yet operational or ready for plot handover.
Wider project context
Orvakal was formally approved as an industrial smart city node in 2024. At that time it was reported that the Union Cabinet approved 12 new project proposals under the National Industrial Corridor Development Programme with an estimated investment of Rs 28,602 crore, of which 2,621 acres would be allotted at Orvakal with Rs 2,726 crore to be spent, aimed at providing employment to 45,000 people.
By the time of the October 2025 foundation-stone event, the publicised scope had grown: OIA is spread across 2,621 acres in Kurnool district and envisioned as an integrated, self-sustaining industrial township combining industrial, residential, commercial and social infrastructure, with the Prime Minister inaugurating the Kopparthy and Orvakal parks together in a combined investment of ₹4,920 crore announcement, and OIA separately cited as carrying an investment potential of about ₹12,000 crore, catering to sectors including automobile components, renewable energy, aerospace and defence, electrical and electronics, textiles and apparel, pharmaceuticals, and gems and jewellery. Note that funding figures cited across sources (Cabinet-approval estimate, EPC contract value, IIG total project cost) refer to different scopes and stages of the project and should not be treated as interchangeable.
The site itself sits in Orvakal Mandal: spread between Orvakal, Uppalapadu, Guttapadu, Meedivemula and N. Konthalapadu villages, bordered by Uppalapadu to the south, Guttapadu to the east, an unmettled road to the west and stony waste/scattered boulders to the north, with connectivity via NH40, NH44 and the Kurnool Bypass.
Frequently asked questions
What exactly does "Notice to Proceed" mean for Orvakal?
It marks the point where the appointed EPC contractor is cleared to start actual site mobilisation and construction of trunk infrastructure — roads, sewerage/effluent networks, and power works — rather than remaining at the tendering or contract-signing stage.
Who is building the common infrastructure at Orvakal?
M/s GVPR Engineers Ltd, which received the Letter of Award on 9 October 2025 for ₹1,197 crore, with the contract agreement executed on 30 October 2025 with the project SPV, APICDC.
Which body issued this decision — NICDC or someone else?
The direct contracting party is the AP Industrial Corridors Infrastructure Development Corporation (APICDC), a joint SPV of the Government of Andhra Pradesh (via APIIC) and the Centre (via NICDIT), operating under the National Industrial Corridor Development Programme overseen by NICDC.
Why do sources quote different cost figures for Orvakal?
Different figures refer to different scopes: the EPC contract itself is worth ₹1,197 crore; the India Investment Grid tracker lists a broader "Total Project Cost" of USD 350.31 million; and separate 2024 Cabinet-approval and 2025 launch statements cite still other overall investment estimates for the node.
How large is the area covered by this contract?
The works apply to the Phase 1 Activation Area of 2,621 acres (about 10.61 sq km), which is demarcated with permanent boundary survey markers, out of a larger 9,305-acre node for which detailed master planning was commissioned.
When is this infrastructure package due to finish?
The India Investment Grid tracker lists the project timeline running to 30 October 2028.
Does this mean Orvakal is now ready for industries to set up plants?
No. As of the latest reporting (December 2025–January 2026), the EPC contractor has only begun site establishment, survey and design work following the kick-off meeting; the area is not yet operational or open for plot allotment.
Sources
- Orvakal Industrial Area in Kurnool (Andhra Pradesh) — India Investment Grid
- NICDC — Orvakal, Andhra Pradesh (12 New Projects)
- NICDC — Orvakal Industrial Area, Andhra Pradesh
- National Industrial Corridor Development Corporation — DMU Report, 30.11.2025 (DPIIT)
- National Industrial Corridor Development Corporation — DMU Report, 31.01.2026
- PM Modi opens two new industrial parks in Andhra — Maritime Gateway
- Centre picks Kopparthy, Orvakal as smart cities — The Hans India
- Industrial Park at Orvakal, Orvakal Mandal, Kurnool District, Andhra Pradesh — Prefeasibility Report, MoEFCC
- Volume II: Technical Specifications — Orvakal Node EPC
- New EPC Tender — KRISCITY / APICDC
- India emerging as a trusted global partner — India Shipping News
- National Industrial Corridor Development Programme (NICDP) — DPIIT