New Cities India

New Launch Update

Adarsh Primrose in Gunjur, Varthur Road: 220-Unit Project Listed as New Launch

Adarsh Primrose, a 220-unit apartment project developed by Akarsh Dwellings Private Limited under the Adarsh brand, is listed as a New Launch on Gunjur, off Varthur Road, in east Bengaluru. The project was launched on 15 November 2024, is registered with Karnataka RERA, and carries a September 2028 possession date.

Realty News — Adarsh Primrose in Gunjur, Varthur Road: 220-Unit Project Listed as New Launch
ProjectAdarsh Primrose, Gunjur (off Varthur Road), Bengaluru East
DeveloperAkarsh Dwellings Private Limited, marketed under the Adarsh Developers / Adarsh Group brand
StatusListed as New Launch; launched 15 November 2024. Developer project page shows On-going (as of 28 October 2026)
Karnataka RERA numberPRM/KA/RERA/1251/446/PR/140325/007583, registered 14 March 2025
Possession date30 September 2028 (RERA and developer timeline)
Scale220 units on 2.33 acres, two wings, 80% open space
Configurations2 BHK (1,205 sq ft); 3 BHK from 1,550 sq ft to 1,880 sq ft super area
Price band3 BHK from ₹1.70 Cr to ₹2.20 Cr, as updated on 21 September 2026; stamp duty and registration extra
Construction progress30% complete as of 26 February 2026

Launch status and developer

Adarsh Primrose was officially launched on 15 November 2024. Property listing sites tag it as a New Launch, while the developer's own project page shows its status as On-going. As of 26 February 2026, construction was reported at 30% complete.

The project is developed by Akarsh Dwellings Private Limited. The project is also seen on some portals under the name Akarsh Adarsh Primrose. Adarsh Group, the brand behind the project, was founded in 1988.

In late October 2026, Piramal Finance sanctioned ₹80 crore to Akarsh Dwellings Private Limited for Adarsh Primrose, according to a LiveLaw report on a ₹125 crore financing arrangement for two Bengaluru projects. A separate ₹45 crore went to Adarsh Developers for Adarsh Stratuss. This is project finance to the developer, not a home loan for buyers.

Project scale and layout

The project covers 2.33 acres and is planned as a single phase with 220 units. It has two wings. Wing A has two basement floors, a ground floor and eight upper floors. Wing B has two basement floors, a ground floor and 14 upper floors. Each floor has six units.

The developer describes the site as a low-density community with 80% open space and a clubhouse of about 20,000 sq ft. Around 172 units were reported as on offer at the time of the latest listing data.

Configurations and price band

The project lists a 2 BHK unit of 1,205 sq ft super area and three-bedroom units of 1,550, 1,770 and 1,880 sq ft super area. The larger two three-bedroom plates have three bathrooms, one for each bedroom.

ConfigurationSuper areaCarpet areaPrice reported
2 BHK1,205 sq ft—₹1.35 Cr plus charges (June 2026)
3 BHK compact1,550 sq ft1,054 sq ftFrom ₹1.70 Cr (21 September 2026)
3 BHK1,770 sq ft1,203 sq ft₹1.95 Cr to ₹1.98 Cr
3 BHK with three bathrooms1,880 sq ft1,278 sq ft₹2.10 Cr to ₹2.20 Cr

Listing data for the project area shows an average of ₹10,450 per sq ft in Q1 2026, rising to ₹11,350 per sq ft in Q2 2026. The price band of all-inclusive figures is ₹1.7 Cr to ₹2.2 Cr, updated on 21 September 2026.

Payment plan and charges

The project uses a Construction Linked Plan. A 10% token is paid on booking, 10% on agreement within 30 to 45 days, 75% is paid in slabs as construction stages are completed, and 5% is due on possession. GST and other charges are extra. The minimum down payment is stated as ₹17.00 lakh inclusive of taxes.

Stamp duty and registration are excluded from the all-inclusive price.

RERA registration and approvals

The project is registered with Karnataka RERA under PRM/KA/RERA/1251/446/PR/140325/007583, with registration on 14 March 2025 and a RERA possession date of 30 September 2028. No pending litigation is reported for the project.

The land is at Survey Numbers 76/1 and 82, Gunjur, in Varthur Hobli, Ward 149. The project has not received an occupation certificate or completion certificate, as it is under construction.

Specifications and amenities

The developer says the apartments are Vaastu compliant. Architect and landscape designer names are not part of the public material.

Location and connectivity

The project sits on Gunjur Main Road, off Varthur Road, in Ward 149. Varthur–Sarjapur Road is about 1.4 km away, and MG Road is about 18 km away. ITPL is 10 to 15 minutes east, and Wipro SEZ and RGA Tech Park are within about 10 minutes south.

State Highway 35 passes Varthur, Gunjur and Sarjapur, linking the area to Hoskote, Kadugodi, Whitefield and Attibele. Krupanidhi Degree College is about 750 m away. The Purple Line extension to Whitefield (Kadugodi) is operational and is within 6 to 8 km of Gunjur. A new suburban railway station is about 3 km from Gunjur.

Infrastructure in the corridor

Market and demand context

A Hans India report says more than 9,000 housing units were supplied in Gunjur in Eastern Bengaluru after the pandemic. Demand in adjacent micromarkets such as Gunjur has intensified, with housing demand in 2024 up 39% from the previous year.

Comparable projects in the wider east Bengaluru market include Adarsh Tropica on Sarjapur Road, with a 3 BHK of 1,395 sq ft listed at ₹1.77 Cr, and Adarsh Parkland on Panathur Road, priced from ₹1.75 Cr to ₹2.4 Cr. Panathur is not in Gunjur.

Developer background

Adarsh Group was founded in 1988 by B. M. Jayeshankar, a civil engineer and chairman. According to the developer's website, it has completed more than 33 projects and delivered over 29.61 million sq ft. It reports 17.97 million sq ft of ongoing projects and 21.36 million sq ft of upcoming projects. The group works mainly in Bengaluru and also runs hospitality properties.

Other Bengaluru projects by the group include Adarsh Palm Meadows, Adarsh Palm Retreat, Adarsh Serenity on Sarjapur Road and Adarsh Wisteria on Hennur Main Road.

Frequently asked questions

What is the current status of Adarsh Primrose?

Adarsh Primrose was launched on 15 November 2024 and is listed as a New Launch on property portals. The developer's project page shows it as On-going. As of 26 February 2026, construction was 30% complete.

When is possession due?

The RERA possession date is 30 September 2028, and the developer's timeline also gives September 2028.

What is the price range?

The all-inclusive price band for three-bedroom units was updated to ₹1.7 Cr to ₹2.2 Cr on 21 September 2026. A 2 BHK of 1,205 sq ft was listed at ₹1.35 Cr plus charges in June 2026. Stamp duty and registration are extra.

Is the project registered with RERA?

Yes. It is registered with Karnataka RERA under PRM/KA/RERA/1251/446/PR/140325/007583, with registration on 14 March 2025. No pending litigation is reported.

How is the payment structured?

The project uses a Construction Linked Plan. It has a 10% payment on booking, 10% on agreement, 75% linked to construction stages, and 5% on possession, with GST and other charges extra.

How far is the project from key roads and job centres?

Varthur–Sarjapur Road is about 1.4 km away and MG Road about 18 km. ITPL is 10 to 15 minutes east, and Wipro SEZ and RGA Tech Park are about 10 minutes south.

Sources

Want the price sheet or a site visit?

Register once — we connect you with the developer’s sales team for this launch.