Project Launch
Adore Prima 2 in Sector 73, Faridabad: New Launch With Possession Set for August 2030
Adore Prima 2 is a new residential project in Village Mirtazapur, Sector 73, Faridabad, listed as a New Launch with a 4 BHK apartment configuration and a stated base price of Rs 60 lakh onwards plus charges. As of 31 October 2026, the project is registered with Haryana RERA and has an expected possession date of 31 August 2030.

| Developer | Adore Homes LLP (promoter named on the Haryana RERA form); marketed under Adore Realtech, part of Adore Group |
|---|---|
| Location | Village Mirtazapur, Sector 73, Tehsil Tigaon, District Faridabad, Haryana |
| Status (as of 31 October 2026) | New Launch, with booking open per the developer's listing |
| RERA registration | HRERA-PKL-FBD-766-2025; project submitted to Haryana RERA on 20 August 2025 |
| RERA possession date | 31 August 2030 |
| Configuration | 4 BHK apartment, carpet area 1,418 sq ft (about 131.74 sq m) |
| Price band | Rs 60 lakh onwards for the 4 BHK, plus charges; GST of 5% extra |
| Booking amount | Rs 5 lakh |
| Land and scale | 4.10 acres within a licensed area of 55.919 acres; one tower of 14 floors; 20% open area |
Launch status and what has been filed
Adore Prima 2 is listed on property platforms as a New Launch, with booking described as open and possession described as starting from August 2030. The project was submitted to the Haryana Real Estate Regulatory Authority (HRERA), Panchkula, on 20 August 2025, which places it well short of completion. The Haryana RERA project record gives the expected possession date as 31 August 2030.
The project is distinct from Adore Prima (phase 1, Sector 72-73, RERA HRERA-PKL-FBD-652-2025). Buyers comparing the two should check the registration number on each project record.
Configuration, size and price
The only configuration listed for Adore Prima 2 is a 4 BHK apartment with a carpet area of 1,418 sq ft. The listed base price is Rs 60 lakh onwards, and the listing notes that charges apply on top of that base price. GST at 5% is shown as extra.
For arithmetic only, the base price divided by carpet area works out to roughly Rs 4,230 per sq ft. This is a calculation from the headline price, not a figure published by the developer. The developer's price sheet does not list a per-sq-ft rate, a super area figure or a unit count for this project.
A booking amount of Rs 5 lakh is listed. The listing states that a premium on the basic amount applies per floor. The payment plan is named as the Construction Link Payment Plan, with a possession timeline of four years shown on the listing.
Layout and building
The project is a single tower of 14 floors on a 4.10-acre site. The Haryana RERA form records a total licensed area of 55.919 acres, of which this project is part. Open area is 20%. The developer describes each apartment as a four-side open corner unit with no shared walls, and the site is listed as fronting a 45-metre main road with internal roads of 15 and 6 metres.
The RERA form lists the estimated cost of the project at Rs 15,375 lakh. Road, water, electricity, sewage and other infrastructure facilities are shown as yet to be prepared on the RERA record.
Amenities and specifications
- Swimming pool, children's play area and pet park
- 24x7 power backup and gated security
- Automatic high-speed lifts with backup power, per the developer's stated plan
- Dual water supply from municipal and borewell or tank sources
- Manned security, visitor management system and CCTV coverage
Clubhouse, gym, sports courts and specifications such as flooring, fittings and fixtures are not described in the published listing for this project.
Location and connectivity
Sector 73 is served by Kheri Road, Tigaon Road and Faridabad Bypass Road, which connect to NH-44. The Sant Surdas (Sihi) Metro Station on the Violet Line is about 4.1 km from the sector. The 26 km stretch of the DND-KMP Expressway from Sector 65 to Sohna opened in 2023, and a 24 km stretch from Jaitpur to Sector 65 opened to traffic on 12 November 2024.
Jewar (Noida International) airport is the nearest major airport. A dedicated expressway from Greater Faridabad to the airport is planned, with a travel time of around 30 to 45 minutes once complete. The completion year for that expressway has not been set.
Infrastructure under way
- FNG Expressway (Faridabad-Noida-Ghaziabad): 56 km, six lanes, under construction. The Faridabad stretch is targeted for 2027. It begins at Ma Amrita Hospital in Greater Faridabad.
- Faridabad-Gurugram metro link: a 31 km line from Bata Chowk to HUDA City Centre has an approved detailed project report, with completion expected by 2027.
- Gurugram-Faridabad-Noida-Greater Noida rapid transit corridor: a 64 km alignment has been finalised, with about 52 km inside Haryana. No completion year has been set.
- Western Peripheral Expressway (Kundli-Manesar-Palwal): operational. HSIIDC is building multimodal transit centres at Sonipat, Bahadurgarh, Gurugram and Faridabad.
Local and regional market
A resale listing for a 3 BHK of 1,803 sq ft in Sector 73 is shown at Rs 65 lakh, with no listing date given. No dated price trend or rental yield figure for Sector 73 is available from the sources used for this article.
Across Delhi-NCR, housing sales rose 63 per cent year on year to Rs 1.53 lakh crore in calendar year 2024, according to market data cited in the sources used for this article.
About the developer
Adore Group was started in 2015 by Kaptan Singh and Jetaish Gupta. The group says it has delivered 17 residential projects, mainly in Faridabad and Gurugram, with about 20 million sq ft of built-up area across its projects. Its first Faridabad project launched in September 2015 and received an occupation certificate by September 2018. Adore Happy Homes Grand in Sector 85 had a stated possession date of December 2019.
In May 2025, Adore Group announced an investment of around Rs 800 crore in a 5.47-acre project in Sector 76, Faridabad, with 190 apartments. That project is separate from Adore Prima 2.
Approvals and charges
The land licences listed on the state record are dated 14 January 2018 (Licence 04 of 2018), 1 September 2023 (Licence 176 of 2023) and 10 July 2024 (Licence 78 of 2024). Layout, building plan, floor plan and FAR approvals are marked as approved on the record. The building plan approval date is recorded as NA. No occupation certificate or completion certificate has been issued, as the project is at the New Launch stage.
An earlier RERA form listed 1 January 2026 as the likely construction start date and 31 December 2029 as the completion date. The later filing gives 31 August 2030 as the expected possession date.
Charges shown for the project include GST at 5% and a premium on the basic amount per floor. Car parking, PLC, EDC/IDC, power backup and maintenance charges are not itemised in the published listing.
Frequently asked questions
Is Adore Prima 2 under construction?
The project is listed as a New Launch. The earlier RERA form gave 1 January 2026 as the likely construction start date, and the later filing gives 31 August 2030 as the expected possession date.
What is the RERA registration number for Adore Prima 2?
The Haryana RERA registration number is HRERA-PKL-FBD-766-2025. The project was submitted to Haryana RERA on 20 August 2025. Adore Prima phase 1 uses a different number, HRERA-PKL-FBD-652-2025.
What configuration and price are offered?
The listing shows a 4 BHK apartment with a carpet area of 1,418 sq ft, starting at Rs 60 lakh plus charges. GST at 5% is shown as extra, and the booking amount is Rs 5 lakh.
How far is the nearest metro station?
The Sant Surdas (Sihi) Metro Station on the Violet Line is about 4.1 km from Sector 73.
When is possession expected?
The Haryana RERA record gives 31 August 2030 as the expected possession date. The developer's listing also states August 2030.
What amenities are listed?
The listing includes a swimming pool, children's play area, pet park, 24x7 power backup, gated security, dual water supply, manned security and CCTV coverage.