Mumbai New Launch
DPS Elite, Kanheri, Borivali East: New Launch Under MahaRERA Registration
BP Infra Buildcon LLP has a new project, DPS Elite, on a 663 sq m plot at Kasturba Cross Road No. 5 in Kanheri, Borivali East, registered with MahaRERA on 9 October 2026. The project is listed as a new launch, with a promoter-declared completion date of 1 March 2029.

| Project | DPS Elite |
|---|---|
| Developer | BP Infra Buildcon LLP (promoter of record) |
| Location | Kasturba Cross Road No. 5, Kanheri, Borivali East, Mumbai, Mumbai Suburban district, Maharashtra 400066 |
| MahaRERA registration | PM1180002602242, registered 9 October 2026 |
| Land area | 663 sq m (about 0.16 acres), with one building listed under the registration |
| Promoter-declared completion date | 1 March 2029 |
| Status (as of 22 October 2026) | New Launch |
| Nearest metro station | Devipada, on operational Mumbai Metro Line 7, about 658 m away |
Project status and registration
DPS Elite is listed as a new launch. As of 22 October 2026, the public project record shows a MahaRERA registration dated 9 October 2026 (PM1180002602242). The registration certificate is recorded as signed, and the registered promoter is BP Infra Buildcon LLP.
The registration covers one building. The filed land record identifies survey number 78A, with the plot bounded by M. K. Apartment to the north, Shiva Shiv Building to the east, a 6-metre road to the south and Kasturba Road No. 5 to the west.
The project record lists 0% against the construction stages it tracks, including excavation, podium, plinth, stilt, superstructure, internal finishes and occupation certificate readiness. The record describes these figures as a snapshot taken at filing, not a live progress tracker. The promoter has declared a completion date of 1 March 2029.
The MCGM is the planning authority named on the project record, and an approved building plan is filed with the record.
Location and connectivity
The project sits in the Kanheri area of Borivali East, a western suburb of Mumbai. Mapped distances from the project coordinates are:
- Devipada Metro station (Mumbai Metro Line 7): about 658 m
- Western Express Highway: about 658 m, the expressway named on the project record
- Swami Vivekanand Road: about 426 m
- Railway line: about 246 m, with the specific station distance not established
- Six bus stops within 500 m
- Mumbai Airport (CSMIA): about 16.9 km by road to Borivali East as an area-level route figure, not a measured distance from the project
Nearby facilities mapped from the project coordinates include a hospital about 80 m away, a mall about 491 m away, a supermarket about 668 m away, one school within 500 m, twelve clinics within 1 km, a park about 1.4 km away and the Veer Savarkar Udyan Pond about 966 m away.
Transport infrastructure
Mumbai Metro Line 7 runs 16.5 km as an elevated corridor with 13 stations between Andheri East and Dahisar East. MMRDA reports the line as operational.
Metro Line 7A, which runs from Andheri East to CSMIA Airport, is under construction. MMRDA reported construction progress as of 31 August 2026.
The Thane–Borivali twin-tunnel road project is described in MMRDA's detailed project report as an 11.85 km twin-tube tunnel connecting Thane Ghodbunder Road to the Western Express Highway at Borivali. The report does not set a completion date for the project.
Local market context
Property listing data for Borivali East gives different readings depending on method, so the figures below are shown side by side rather than as one price band:
- Average flat asking prices of about ₹24,825 per sq ft for July–September 2026, up 8% quarter-on-quarter, based on listings.
- A median asking price of ₹36,700 per sq ft as of 8 October 2026, based on 398 live listings, with a middle-half range of ₹31,100 to ₹45,800 per sq ft.
- A rental yield of 3.20% for Borivali East as of September 2026.
These are listing-based figures and do not represent DPS Elite's prices. The project has not been priced in the records reviewed for this article.
Other projects in the same area
Four other residential projects in Kanheri and Borivali have target completion dates in the same period. Their listed flat counts and target completion dates are:
| Project | Flats | Target completion |
|---|---|---|
| Sadguru Trimurti | 28 | August 2027 |
| Swanand Co-operative Housing Society Limited | 60 | December 2027 |
| Shreenath Regency | 17 | October 2027 |
| Radiance Regalia | 11 | December 2028 |
About the developer
BP Infra Buildcon LLP was incorporated on 21 April 2023, according to company-registry search results. The public MahaRERA records identify DPS Elite and DPS Vista under the same LLP. DPS Vista is a separate project with its own registration. The group's website describes more than 10 years of operation, 10 or more awards and more than 500 families served.
DPS Vista, a separate BP Infra project in Borivali East, is listed with 2 BHK carpet areas of 530–710 sq ft, 3 BHK carpet areas of 856–940 sq ft and a jodi-flat option of 1,100 sq ft. These figures relate to DPS Vista and are included only as a reference for the developer's recent product range.
Frequently asked questions
Is DPS Elite registered with MahaRERA?
Yes. The project is registered under MahaRERA number PM1180002602242, dated 9 October 2026. The promoter of record is BP Infra Buildcon LLP.
What is the promoter-declared completion date?
The promoter has declared a completion date of 1 March 2029, as shown on the project's MahaRERA record.
What is the nearest metro station to DPS Elite?
Devipada station on Mumbai Metro Line 7 is about 658 m from the project coordinates. Line 7 is operational, according to MMRDA.
How big is the plot?
The filed land area is 663 sq m, about 0.16 acres, and the registration covers one building.
Is the Thane–Borivali twin-tunnel road complete?
No. MMRDA's detailed project report describes an 11.85 km twin-tube tunnel linking Thane Ghodbunder Road to the Western Express Highway at Borivali. The report does not give a completion date.
What is the status of the Metro Line 7A extension to the airport?
MMRDA reported construction progress as of 31 August 2026.