Mumbai Realty
DGS Bandra East listed as upcoming near BKC, with 2 and 3 BHK homes
DGS Group is marketing a residential development in Kalanagar, Bandra East, as a new launch near BKC. Its project page lists 2 and 3 BHK apartments with private decks, with advertised prices of ₹4.5 crore and ₹6.4 crore respectively; the page does not display a MahaRERA registration number.

| Developer | DGS Group |
|---|---|
| Location | Kalanagar, BKC, Bandra East, Mumbai |
| Status | Listed as a new launch; as of October 2026 |
| Homes | 2 and 3 BHK apartments with decks |
| Advertised prices | ₹4.5 crore for 2 BHK and ₹6.4 crore for 3 BHK |
| Listed carpet areas | 820 sq. ft. for 2 BHK; 1,165–1,200 sq. ft. for 3 BHK |
| Possession | Developer pages state December 2029 |
| MahaRERA | The project page’s registration-number field is blank |
New-launch listing and apartment mix
DGS Group’s Bandra East project is presented on its project page as a new launch at Kalanagar, BKC. The page describes a 15-storey residential tower, with commercial shops on the ground and first floors. It lists 2 BHK homes with 820 sq. ft. carpet area and 3 BHK homes with 1,165–1,200 sq. ft. carpet area. Both configurations are described as having decks; the page also refers to Jodi apartments.
The developer’s listed prices are ₹4.5 crore for a 2 BHK and ₹6.4 crore for a 3 BHK. These are advertised figures, not a dated price sheet. The project page leaves the MahaRERA registration-number field blank, so the launch listing should not be read as confirmation of a registered project.
BKC location and transport context
Kalanagar is in Bandra East, beside Bandra Kurla Complex, Mumbai’s established business district. BKC has continued to attract office occupiers and major commercial development, while the opening of Metro Line 3’s first section added a rapid-transit connection serving the district. Mumbai Metro Rail Corporation reported that the Aarey JVLR–BKC section began operations in October 2024. The project website gives no verified project-specific travel distances, so nearby infrastructure should not be taken as a measured commute from the site.
Possession and project status
The developer’s project material states a December 2029 possession timeline. As of October 2026, the development remains listed as a new launch; the developer’s public page does not provide a construction-stage update or a MahaRERA number. Buyers should distinguish the developer’s stated timeline from a possession date recorded in a project registration.
Frequently asked questions
What is DGS Bandra East?
It is a DGS Group residential project listed as a new launch in Kalanagar, Bandra East, near BKC.
What apartment configurations are listed?
The project page lists 2 BHK and 3 BHK apartments with decks, as well as Jodi apartments.
What prices and carpet areas are advertised?
The listed 2 BHK is 820 sq. ft. carpet area at ₹4.5 crore. The 3 BHK is 1,165–1,200 sq. ft. carpet area at ₹6.4 crore. These are developer-advertised figures.
What possession timeline does the developer state?
The project material states December 2029.
Does the listing show a MahaRERA registration number?
The project page’s RERA registration-number field is blank.
What transport infrastructure serves the broader area?
BKC is served by the operational Aarey JVLR–BKC section of Mumbai Metro Line 3, which opened in October 2024.