New Cities India

New Launch Watch

DTC Embassy Villa in Rajarhat: What the RERA Filings and Developer Listing Show

DTC Group's DTC Embassy Villa in Rajarhat, Kolkata, is listed as a New Launch, but the official records show it is already registered with the West Bengal Real Estate Regulatory Authority (WBRERA) and under construction. As of October 2026, the two phases are registered for 153 villas in total, with a documented completion date of 31 December 2031.

Realty News — DTC Embassy Villa in Rajarhat: What the RERA Filings and Developer Listing Show
DeveloperDTC Projects Private Limited, part of DTC Group (no joint venture partner found)
LocationRajarhat Main Road, Mouza Kamduni, Kirtipur-II Gram Panchayat, Barasat-II, PS Rajarhat, North 24-Parganas, Kolkata 700135
RERA registrationsPhase-1: WBRERA/P/NOR/2026/004074 (registered 28 February 2026). Phase-2: WBRERA/P/NOR/2026/004832 (registered 7 September 2026)
ScalePhase-1: 82 villas on 14,288 sq m of land. Phase-2: 71 villas on about 2.5 acres (secondary listing). Total: 153 villas
Configurations4 BHK Type A (1,870 sq ft), 4 BHK Type B (1,910 sq ft), 5 BHK Type C (2,717 sq ft), as listed by secondary sources
PriceDTC listing: from ₹1.6 crore for 4 and 5 BHK villas. No dated official price list found
Completion date (WBRERA)31 December 2031 for both phases.
StatusWBRERA lists Phase-1 as Under Construction; DTC's listing says Ongoing; 'New Launch' appears in some marketing material (as of October 2026)

Status: launch label versus registered project

DTC Embassy Villa is described as a New Launch in the editorial brief, but the regulatory record is more advanced. The West Bengal Real Estate Regulatory Authority lists Phase-1 as Under Construction, and DTC's own project listing uses the label Ongoing. The term New Launch appears in some marketing materials. The difference matters for buyers: a project under construction and registered with RERA is at a different stage from one that is still pre-registration.

Phase-1 was registered on 28 February 2026. Phase-2 was registered on 7 September 2026. No launch date, expression-of-interest date or booking-opening date has been published by the developer or found in the records reviewed.

Phases and scale

The project is being built in two RERA-registered phases:

Across both phases, the project is listed at 153 villas. DTC advertises about 70,000 sq ft of greenery and landscaped space for the overall development.

The storey count is not consistent across sources. DTC describes the villas as G+2. A separate third-party listing describes Phase-1 as G+1. The WBRERA filing reviewed does not settle the point.

Configurations and prices

TypeSuper/listed areaPrivate open space (secondary listing)
4 BHK Type A1,870 sq ft578 sq ft
4 BHK Type B1,910 sq ft584 sq ft
5 BHK Type C2,717 sq ft1,002 sq ft

The area basis (carpet or built-up) is not stated for these figures. Unit-by-unit carpet areas were not found in the WBRERA record.

DTC's listing gives a starting price of ₹1.6 crore for its 4 and 5 BHK villas, without separating prices by configuration. A secondary listing shows unit prices of about ₹1.60 crore for Type A, ₹2 crore for Type B and ₹2.50 crore for Type C. The same secondary page also shows alternative figures of ₹1.50 crore, ₹1.90 crore and ₹2.90 crore, which do not match. These prices were displayed online when checked on 7 October 2026. No dated official rate card, payment plan, booking amount or offer was found.

Possession timeline

WBRERA records a completion date of 31 December 2031 for both Phase-1 and Phase-2. This is the regulatory completion date in the filings, not a developer's handover commitment.

Specifications and amenities

DTC's project material and secondary listings describe a double-height living room, a skylight over the living area, private gardens, balconies, open terraces and private skylights for the villas. Covered car parking is recorded for Phase-1 in the RERA filing.

DTC lists a clubhouse, green podium and landscaped greenery, an open-air theatre and a jacuzzi. A secondary listing names a swimming pool, gym, indoor games area, bowling arcade, jogging track, yoga and meditation space, children's play area, amphitheatre, water plaza and landscaped garden.

Location and nearby places

The site is on Rajarhat Main Road in Mouza Kamduni, under the Kirtipur-II Gram Panchayat, in Barasat-II and PS Rajarhat. A secondary listing places it about five minutes' drive from Rajarhat Chowmatha. DTC says the project offers access to New Town, Sector V, Kolkata Airport and the upcoming CBD-2 Metro Station. The developer's page does not publish verified distances or travel times.

A secondary listing gives indicative drive times: Apex Hospital about 9 minutes, DPS Megacity about 18 minutes, City Centre 2 about 19 minutes, and Ecospace and TCS about 20 minutes. These are listing estimates with no stated kilometre distances or measurement date.

No verified distances to the nearest railway station, airport, highway or metro station were found.

Developer background

DTC Projects Private Limited is the promoter named in the RERA records, and WBRERA records its establishment year as 1995. DTC Group describes itself as a Kolkata-based group with mining, real-estate and infrastructure interests, and says it has more than 40 years of mining experience. The group's founding year was not found.

DTC reports about 20 lakh sq ft of residential and retail space delivered, comprising nearly 1,600 homes, and more than 60 lakh sq ft under active development, comprising about 4,000 homes. It states delivery targets of 2,500 homes by 2027 and the remaining 1,500 by 2029. Other Kolkata projects it names include DTC Capital City Rajarhat, DTC Downtown, DTC Still Waters, DTC Palm Grove, DTC Sojon, DTC Good Earth, DTC Southern Heights and Orchid Tower.

Dated timeline

No verified booking totals, sales figures, awards or construction-milestone announcements were found.

Development phases

Phase 1Registered 28 February 2026; completion 31 December 203182 villas, 14,288 sq m land, 82 covered car parks;WBRERA/P/NOR/2026/004074Phase 2Registered 7 September 2026; completion 31 December 203171 villas on about 2.5 acres (secondary listing);WBRERA/P/NOR/2026/004832

Frequently asked questions

Is DTC Embassy Villa a new launch?

The project is labelled New Launch in some marketing material. However, WBRERA lists Phase-1 as Under Construction, and DTC's project listing says Ongoing. Phase-1 was registered on 28 February 2026 and Phase-2 on 7 September 2026.

What is the RERA number for DTC Embassy Villa?

Phase-1 is WBRERA/P/NOR/2026/004074 (project ID WBRERA/NPR-005064). Phase-2 is WBRERA/P/NOR/2026/004832 (project ID WBRERA/NPR-005873).

How many villas are planned?

WBRERA records 82 villas in Phase-1. A secondary listing gives 71 villas for Phase-2, for a total of 153 across both phases. The Phase-2 figure has not been confirmed in the official record reviewed.

What configurations are offered and at what price?

Sources reviewed list 4 BHK Type A (1,870 sq ft), 4 BHK Type B (1,910 sq ft) and 5 BHK Type C (2,717 sq ft). DTC's listing starts at ₹1.6 crore for its 4 and 5 BHK villas. No dated official price list was found, and a secondary listing shows conflicting prices.

When is possession due?

WBRERA records a completion date of 31 December 2031 for both phases.

How far is the project from Kolkata Airport and New Town?

DTC says the project offers access to New Town, Sector V, Kolkata Airport and the upcoming CBD-2 Metro Station, but it does not publish verified distances. A secondary listing says the site is about five minutes from Rajarhat Chowmatha.

Sources

Want the price sheet or a site visit?

Register once — we connect you with the developer’s sales team for this launch.