Upcoming Projects
Gandharv Leela, Hadapsar: Upcoming 2 and 3 BHK Project on the Pune–Solapur Corridor
Gandharv Developers has listed Gandharv Leela, a residential project of 2 and 3 BHK apartments in Hadapsar, Pune, as upcoming. The project is planned as a single tower on a one-acre parcel, with an all-inclusive price band of ₹89 lakh to ₹1.08 crore as of May 2026.

| Developer | Gandharv Developers |
|---|---|
| Location | Hadapsar, Pune, Maharashtra (near A.M. College and Serum Institute of India) |
| Status | Upcoming (as of 28 October 2026) |
| Product type and configurations | Residential apartments: 2 BHK (750 sq ft carpet) and 3 BHK (910 sq ft carpet) |
| Price band | ₹89 lakh (2 BHK) to ₹1.08 crore (3 BHK), all-inclusive, per listing dated about 27 May 2026 |
| Possession | RERA-stated possession date 1 June 2029; developer target 1 December 2028 |
| Construction | 10% complete as of 27 May 2026 |
| Scale | One acre; one tower of G+3P+19 floors |
| RERA registration | Not yet registered |
Project status
Gandharv Leela is listed as an upcoming project.
The commencement certificate is listed as available. The occupancy certificate will be applied for closer to the possession date, according to the listing.
RERA registration is not yet in place, so buyers should check the registration status on the state RERA portal before committing to any purchase.
Configurations and pricing
The project offers two configurations:
| Type | Carpet area | Price (all-inclusive) |
|---|---|---|
| 2 BHK | 750 sq ft | ₹89 lakh |
| 3 BHK | 910 sq ft | ₹1.08 crore |
The all-inclusive price covers base cost, stamp duty, registration charges, GST and possession charges, according to the listing. A one-parking-space allocation is listed with each unit.
The listed payment plan is the Construction Link Plan, where instalments follow construction progress. Loans of up to 90% are listed as available, and the minimum down payment for a 2 BHK is ₹13 lakh including taxes. The listing names ten banks for home loans. NRI purchase is listed as permitted under FEMA rules.
Monthly maintenance is listed at ₹5,000 for a 2 BHK and ₹6,300 for a 3 BHK. The final maintenance charge is to be confirmed at the time of possession.
Possession and construction
The listing gives a RERA-stated possession date of 1 June 2029, while the developer's own target is 1 December 2028. Construction stood at 10% as of 27 May 2026, and the listing places the project at an early stage of construction, with two to three years to go.
Layout and amenities
The project is planned as one tower of G+3P+19 floors on a one-acre parcel. The floor plan shows four flats per floor, served by four lifts and two staircases. Ground and podium parking are both planned.
Listed amenities include an infinity swimming pool and a kids' swimming pool, a fully equipped gymnasium, a multipurpose hall, a multipurpose lounge with stage, a kids' play area, an amphitheatre, indoor games, a jogging and cycling track, and a yoga lawn with landscaped open spaces.
Location and connectivity
The project is close to the Pune–Solapur Road, about 400 metres away. Hadapsar Gadital bus stand is about 2.5 km away, and Serum Institute of India is about 1 km away. Hadapsar railway station is in the same suburb, on the Mumbai Dadar–Solapur section. The nearest airport is Lohegaon (PNQ).
Infrastructure in the pipeline
Several transport projects affect Hadapsar. Each is at a different stage, and none is complete.
- Hadapsar–Loni Kalbhor Metro: approved by the Maharashtra government on 4 November 2025. The corridor is 11.35 km long with 10 stations, including Hadapsar Phata, Hadapsar Bus Depot and Akashwani-Hadapsar.
- Hadapsar Bus Depot–Saswad Road Metro: approved. It is 5.57 km long with four stations, including Phursungi IT Park.
- Swargate–Hadapsar elevated stretch: planned. It is a 5 km elevated corridor between Bhairobanala and Hadapsar (Akashvani). The Magarpatta flyover is to be rebuilt for it, at an estimated cost of around ₹500 crore. The plan was announced in July 2026.
- Hadapsar–Yavat elevated road: a 31.5 km six-lane elevated road along the Pune–Solapur National Highway, estimated at ₹5,262 crore. A July 2026 report says work is set to begin in 2027.
- Pune Metro Line 4: a plan that may include a station at Hadapsar railway station. This is a plan only.
Local market
As of 22 August 2026, apartment rates in Hadapsar range from ₹6,500 to ₹9,500 per sq ft. An older, undated figure puts the average asking price at about ₹11,550 per sq ft, so the more recent range is the one to use.
About the developer
Gandharv Developers was established in 2003 and is led by founder Sanjay Raskar. The company lists eight completed projects and four ongoing projects in its current portfolio. Its Pune projects include Gandharv Serenity in Hadapsar, launched in January 2017 and handed over with possession in December 2019, in line with its RERA-stated completion date. Other projects are in Pimpri-Chinchwad, Chakan and Magarpatta.
Frequently asked questions
Is Gandharv Leela RERA registered?
No. The project is listed as not yet registered. A RERA possession date of 1 June 2029 is shown in the listing, but no confirmed registration number is available from the sources reviewed.
What are the prices for Gandharv Leela?
The listing gives an all-inclusive price of ₹89 lakh for a 2 BHK of 750 sq ft carpet area and ₹1.08 crore for a 3 BHK of 910 sq ft carpet area, as of about 27 May 2026. The price includes stamp duty, registration, GST and possession charges.
When is possession expected?
The RERA-stated possession date is 1 June 2029. The developer's target is 1 December 2028.
How is the payment structured?
The listed payment plan is the Construction Link Plan, with instalments tied to construction progress. Loans of up to 90% are listed as available, and the minimum down payment for a 2 BHK is ₹13 lakh including taxes.
What transport links are planned near Hadapsar?
The Hadapsar–Loni Kalbhor and Hadapsar Bus Depot–Saswad Road metro lines are approved. A 5 km elevated corridor between Bhairobanala and Hadapsar is planned, and a 31.5 km elevated road to Yavat is also planned. None of these is complete.