New Cities India

Project Status

Kalyan Residency in Kongaon, Kalyan West: Launch Status, Pricing and Metro Access

Kalyan Residency, a small 1 BHK scheme by Kalyan Group in Kongaon, Kalyan West, is listed as a new launch on some channel-partner pages, but listing records place its launch in July 2022. As of October 2026 its target possession date of 1 December 2025 has passed.

Realty News — Kalyan Residency in Kongaon, Kalyan West: Launch Status, Pricing and Metro Access
DeveloperKalyan Group, as named on the project page and listings
LocationKongaon, Kalyan West, Kalyan, Thane district, Maharashtra (PIN 421311), near the Kalyan-Bhiwandi Bypass
LaunchJuly 2022, per listing records (as of October 2026)
Status as of October 2026Listings describe the project as ready to move; construction was reported 100% complete as of 21 January 2026
Configuration1 BHK, 384 sq ft carpet area (listing data)
Price bandFrom ₹32.99 lakh plus government taxes; about ₹8,591 per sq ft (undated listing data)
ScaleAbout 0.51 acre, two towers, 80 units
RERA registrationP51700034384 (as stated on the developer's project page and in listings)
Target possession1 December 2025, the RERA-linked date in listings

Launch status: new launch or older project?

Some channel-partner pages still carry a New Launch label for Kalyan Residency. Listing records instead date the launch to July 2022, so the project is more than four years old as of October 2026. Buyers reading the label should treat the scheme as a completed-stage project rather than a fresh offering.

Later listings describe the units as ready to move. Earlier listings described construction as still under way, with one reporting 85 per cent completion, which shows how quickly listing data goes out of date.

Developer and RERA registration

The developer's own project page presents Kalyan Residency as a RERA registered Residential project and gives the registration as P51700034384.

Some listings give P51700050410 for this project instead. That number is tied to a separate scheme, Kalyan Surabhi, which is also in Kongaon. Anyone checking registration details should search the MahaRERA portal by project name and confirm the number before relying on it.

Layout, configuration and price

Listing records describe a 0.51-acre plot carrying two towers of 13 floors each, with 80 units in total. Some listings give the plot as one acre, and the smaller figure is the one tied to the RERA record.

The 1 BHK homes are listed at 384 sq ft carpet area, starting from ₹32.99 lakh before government taxes. Listed prices per square foot come to about ₹8,591. Other listings show different starting prices, which is common when pages are not updated at the same time.

Some listings also mention 2 BHK units. The ₹30.99 lakh and 417 sq ft figures that appear on some pages belong to Kalyan Surabhi, not this project.

Amenities and specifications

Listed amenities include a swimming pool, gym, club house, children's play area, indoor games, jogging track, a senior citizen sit-out and a landscape garden. Security and building services listed include 24-hour security, CCTV, fire sprinklers, power backup, lifts, visitor parking, rainwater harvesting and a sewage treatment plant.

Interior specifications on listings include vitrified tile flooring, a granite kitchen platform with a stainless steel sink, imported sanitary fittings and water from both corporation and borewell supply.

Possession and construction timeline

The RERA-linked possession date in listings is 1 December 2025. Listings reporting on construction say the buildings reached 100 per cent completion as of 21 January 2026. Since that date has passed, prospective buyers should confirm the current possession position and completion documents directly with the developer and on the MahaRERA portal.

Location and road access

The project sits in Kongaon, a neighbourhood of Kalyan West in Thane district. Listings place it near the Reliance Petrol Pump and the Kalyan-Bhiwandi Bypass. Kalyan Railway Station is listed at about 10 minutes away, and access to the Mumbai-Nashik Highway is cited in listing material.

Metro Line 5 and 5A: what has been approved

Clearance for the reworked Line 5 and 5A corridor is dated 29 August 2026. One trade report dates the notification to 28 August and says it covers three stretches, including the Durgadi-to-Kalyan section.

Originally, the corridor was planned at about 24.9 km. Land acquisition, rehabilitation and resettlement issues, along with conflicts with the Bhiwandi Bypass Flyover, made construction difficult and contributed to delays.

Under the revised plan, the combined route reaches Ulhasnagar and totals close to 34 km. Its total cost is put at ₹18,130.55 crore. Work on the Thane-Bhiwandi stretch is reported to be close to finished, with a December 2026 opening goal. The Kalyan and Ulhasnagar extension has a 2030-31 timeline. Kongan West and Kongan East are among the later stops named for the line.

The MMRDA is expected to put construction contracts out to tender soon, so the Kalyan-area sections remain at the pre-construction stage as of October 2026.

Market context in Kalyan West

Market data compiled from listing platforms puts average apartment prices in Kalyan West at about ₹10,850 per sq ft, with rental yields near 4 per cent. For Kalyan city as a whole, the same data set shows an average near ₹10,450 per sq ft as of September 2026.

These are indicative averages from listing data and do not describe this project's own pricing.

Frequently asked questions

Is Kalyan Residency a new launch?

Some channel-partner pages label it as a new launch, but listing records date the launch to July 2022. As of October 2026 the listed possession date of 1 December 2025 has passed.

What is the RERA number for Kalyan Residency?

The developer's project page and most listings give P51700034384. Some pages give P51700050410, which is tied to a separate project called Kalyan Surabhi.

How much does a 1 BHK cost at Kalyan Residency?

Listings give a starting price of ₹32.99 lakh for a 384 sq ft carpet 1 BHK, plus government taxes. Other listings show different figures, so check the current price with the developer.

When is possession due?

The RERA-linked target date in listings is 1 December 2025. Listings say construction reached 100 per cent completion as of 21 January 2026.

How close is Metro Line 5 to Kongaon?

Metro Line 5 is a planned corridor. The Thane-Bhiwandi stretch is targeted to open around December 2026, and the Kalyan and Ulhasnagar extension is targeted for 2030-31.

Sources

Want the price sheet or a site visit?

Register once — we connect you with the developer’s sales team for this launch.