Thane Project Watch
Kalyan Vatika in Kon, Thane: Upcoming 1 BHK Project and What Surrounds It
Kalyan Vatika is a 135-unit residential project in Kon village, Bhiwandi taluka, that Kalyan Group markets with 1 BHK homes and a possession date of December 2027. Listings as of October 2026 describe it as under construction, though the brief classes it as upcoming.

| Developer / brand | Marketed by Kalyan Group; RERA promoter of record is Kalyan Avenue, a partnership firm |
|---|---|
| Location | Kon (CT) village, Bhiwandi taluka, Thane district, Maharashtra. Some listings give a Kalyan West address. |
| Status (as of October 2026) | Upcoming per editorial brief; listings show under construction |
| Configuration | 1 BHK apartments, carpet area 350 sq ft to 463 sq ft |
| Price band (October 2026) | ₹40.01 lakh (350 sq ft) to ₹52.92 lakh (463 sq ft); about ₹11,430 per sq ft |
| Scale | 3 towers, 7 floors (ground plus seven), 135 units on about 0.98 acres |
| RERA | MahaRERA registration P51700079636, registered 17 March 2025 |
| Possession | RERA completion date 31 December 2027 |
Status and developer
Kalyan Vatika is registered with the Maharashtra Real Estate Regulatory Authority under number P51700079636, with a registration date of 17 March 2025. The RERA record names Kalyan Avenue, a partnership firm, as promoter, while sales material and listings present the project under the Kalyan Group name. Public records do not show a joint venture partner for the project.
Listings checked in October 2026 describe the project as under construction, and the project's price figures were updated that month. The brief classes the project as upcoming, so readers should treat the construction stage as the developer-reported position rather than an independently verified one. No percentage of work completed has been published.
Configuration, size and price
The project offers 1 BHK apartments. Carpet areas range from 350 sq ft to 463 sq ft, and listed entry prices run from ₹40.01 lakh to ₹52.92 lakh. The per-square-foot rate of about ₹11,430 sits above the Kon locality average of ₹8,650 per sq ft recorded for 2026, and above the Kalyan city average of ₹9,750 per sq ft for June 2026.
Earlier listings quoted lower figures, including ₹28.95 lakh and ₹33 lakh all-in. Those figures predate the October 2026 price sheet and should not be used as current prices.
As of October 2026, five residential transactions had been registered in the project, totalling about ₹2 crore, according to the figures compiled for this report.
Layout and amenities
The project has three towers rising seven floors over a 0.98-acre plot, with a sanctioned built-up area of about 7,037 sq m in RERA-based data. The amenities named across listings include a gymnasium, children's play area, landscape and common gardens, indoor games, a jogging track, CCTV, visitor parking, rainwater harvesting, power backup, a sewage treatment plant and lifts. Some listings also name a swimming pool and clubhouse, but only one channel listing carries that claim, so it is not confirmed elsewhere.
Location and road access
Kon is a village-level area within Bhiwandi taluka, close to the Kalyan–Murbad road corridor. Kalyan Junction railway station, a Central Railway hub with eight platforms, is listed at about 2 km, and the Mumbai–Nashik Highway is the main road link. Local rail stops at Thakurli, Dombivli and Vithalwadi are named as alternatives for Kongaon-area commuters.
Navi Mumbai International Airport began commercial operations on 25 December 2025, and is about 32 km from Thane. Chhatrapati Shivaji International Airport in Mumbai is listed at about 32 km. No direct metro link to Navi Mumbai airport was operating as of August 2026.
Infrastructure under way
Metro Line 5 (the Orange Line) is the main transit project near Kon. Its Phase 1 section, about 11.9 km from Balkum in Thane to Dhamankar Naka in Bhiwandi, has six elevated stations, and the line has stations at Kongaon West and Kongaon East on the existing stretch. An earlier target of December 2026 has been pushed; a January 2027 start is the date reported in recent press coverage. Construction work on the Thane-Bhiwandi stretch is likely to be wrapped up by December 2026, according to officials who recently conducted a joint inspection of the project. A decision on whether the Bhiwandi-Kalyan extension will be built underground or as an elevated stretch is still pending.
The Bhiwandi-to-Kalyan APMC section was put on hold by the state government. A revised alignment for the Metro 5A extension from Durgadi to Kalyan was approved by the Centre in August 2026. The Thane Integral Ring Metro is planned to open in 2029. A proposed Kalyan–Ahmednagar rail line is at the proposal stage.
Local demand context
Bhiwandi is one of the larger warehousing and logistics clusters in the region, and the Kalyan–Murbad and Mumbai–Nashik corridors carry freight and commuter traffic. Nearby social infrastructure listed for the area includes Ved Hospital and Puja Nursing Home within 0.2 km, Podar International School about 2.2 km away, and Metro Junction Mall about 2.4 km away. Demand for Kon's lower-priced stock will depend on metro timing, which has already moved more than once.
Frequently asked questions
Is Kalyan Vatika registered under RERA?
Yes. The project carries MahaRERA registration P51700079636, with a registration date of 17 March 2025. Buyers can check the project's record on the MahaRERA portal.
What configurations does Kalyan Vatika offer?
Current project data lists 1 BHK apartments with carpet areas from 350 sq ft to 463 sq ft. Older listings mentioned a 2 BHK option of about 536 sq ft, which does not appear in the latest data.
What is the price of a unit at Kalyan Vatika?
As of October 2026, listed prices run from ₹40.01 lakh for the 350 sq ft unit to ₹52.92 lakh for the 463 sq ft unit, or about ₹11,430 per sq ft. Payment plans and booking amounts have not been published.
When is possession due?
The RERA completion date is 31 December 2027. Listings show the same month, December 2027, as the possession start.
How far is Kalyan Vatika from the upcoming metro?
Metro Line 5 is planned with stations at Kongaon West and Kongaon East near Kon. Phase 1 is now expected to start operations around January 2027, after an earlier December 2026 target.