Commercial Leasing
Maserati Opens Flagship Showroom at Wadhwa Group's Trade Centre in BKC
Italian luxury carmaker Maserati opened a showroom on the ground floor of Trade Centre, a commercial building developed by The Wadhwa Group in Bandra Kurla Complex (BKC), Mumbai. The announcement is dated 30 October 2026, and the showroom is run by Navnit Maserati, the authorised Maserati dealer for Western India.

| Announced | 30 October 2026 |
|---|---|
| Location | Trade Centre, BKC-CST Link Road, Bandra Kurla Complex, Mumbai 400051 |
| Tenant | Maserati, through its authorised dealer Navnit Maserati |
| Developer | The Wadhwa Group |
| Space | Ground floor of the Trade Centre commercial building |
| Status | Announced and opened, as reported on 30 October 2026 |
| Service | Full Maserati range, manufacturer-approved aftersales service and a Fuoriserie area for bespoke colour and trim |
What happened
On 30 October 2026, Maserati announced a showroom at Trade Centre in Bandra Kurla Complex, Mumbai. The Wadhwa Group said the space is on the ground floor of the building and described it as a prominent location. Maserati presented the new facility at a launch event held at the Grand Hyatt Mumbai on the same day.
The showroom is operated by Navnit Maserati. Maserati's own release describes it as the primary retail hub for Mumbai and Western India. Other reports describe it as the brand's flagship dealership in India. The company's description is the one that should be used when attributing the claim.
The launch event also introduced updated Grecale, GranTurismo and GranCabrio models and the India debut of the GT2 Stradale.
Who is involved
Navin Makhija, Managing Director of The Wadhwa Group, said BKC continues to attract global brands that want a prestigious business address. He said the group focuses on A-grade commercial assets with visibility, accessibility and a premium business environment, and that the Maserati decision supports Trade Centre's standing as a preferred location for premium occupiers.
Sharad Kachalia, Chairman and Managing Director of Navnit Maserati, said the new facility will deliver a retail and aftersales experience matching the character of the Trident, the Maserati emblem.
Maher Abdalla, Managing Director, Maserati MEA, India and Turkey, said the Mumbai opening gives Maserati a stronger base for serving clients across Western India. He described the Indian strategy as sustainable growth with selective network expansion.
Santo Ficili, CEO of Maserati and Alfa Romeo, led the event during his first visit to India.
About Trade Centre
Trade Centre, also written Trade Center, is a commercial project by The Wadhwa Group in BKC, Bandra East. The developer's project page describes a glass-clad building with double-level basement parking and a grand entrance lobby. The project page shows a MahaRERA badge.
The Wadhwa Group is a Mumbai developer. Its website says it has a legacy of more than five decades and lists ongoing commercial projects in BKC, including The Capital and Platina, as well as Venue 52 in Khar West and Vishwaroop IT Park in Vashi.
Regulatory history
The Maharashtra Real Estate Appellate Tribunal (MREAT) directed Wadhwa Constructions to register Trade Centre with MahaRERA. The tribunal cited the absence of a full occupation certificate. The building received a partial occupation certificate in 2008. The tribunal classified the project as ongoing, imposed a penalty of ₹5 lakh, and set a 60-day window for registration. The order was reported in April 2025.
Location and transport
Trade Centre sits in BKC, a few minutes from the main BKC road and the CST Link Road. Metro Line 3 has a BKC station. Metro Line 2B also has stations in BKC.
A July 2025 report said the Mumbai-Ahmedabad bullet train's underground BKC station is slated for completion by late 2027, with three underground levels. The same report said MMRCL and NHSRCL are planning an underground pedestrian link of about 1.3 to 1.4 km from the BKC Metro to the bullet train terminal, with a preliminary tunnel cost estimate of ₹100 to 150 crore. Detailed costs and the body responsible for execution were still to be settled.
What it means for buyers, investors and the market
This story concerns a commercial tenancy. It does not involve residential units. The lease terms, rent, deal value and floor area of the showroom were not included in the company statements, so the effect on Trade Centre's asset value cannot be measured from this announcement.
The companies present the showroom as a regional hub combining sales, aftersales and bespoke configuration in one location. That is a statement by the companies and has not been checked against independent demand or occupancy data for the building.
What comes next
Navnit Maserati has said it plans to run the BKC showroom as the region's primary Maserati retail hub. No dates were given for further openings.
The tribunal's 2025 order set a 60-day window for Trade Centre's MahaRERA registration. The Wadhwa project page shows a MahaRERA badge, and the registration is the regulatory step to watch for the building. The bullet train station is slated for completion by late 2027, according to the July 2025 report.
Frequently asked questions
Where exactly is the Maserati showroom?
The showroom is on the ground floor of Trade Centre, BKC-CST Link Road, Bandra Kurla Complex, Mumbai 400051. The building is developed by The Wadhwa Group.
Who runs the showroom?
Navnit Maserati, the authorised Maserati dealer for Western India, runs the showroom. Its Chairman and Managing Director is Sharad Kachalia.
Is this a residential project?
No. The story covers a showroom lease in a commercial building. No residential units are part of it.
Was the lease value or rent disclosed?
The announcements did not include the rent, lease term, deal value or floor area of the showroom. Any statement on asset values from this deal would be speculation.
What is the regulatory status of Trade Centre?
In April 2025 the Maharashtra Real Estate Appellate Tribunal directed Wadhwa Constructions to register the project with MahaRERA within 60 days, citing the partial occupation certificate and classifying the project as ongoing.