Upcoming Launch
MDB Elysium in Banur: Upcoming Residences on the NH-7 Corridor
MDB Elysium is an upcoming residential project by MDB Group on the Zirakpur-Rajpura Highway (NH-7) in Banur, Mohali. As of 30 October 2026, the developer's own project page shows it as Coming Soon, and no price band or RERA registration number has been published.

| Developer | MDB Group (Metro Developers & Builders), founded 2012, based on VIP Road, Zirakpur |
|---|---|
| Status (as of 30 Oct 2026) | Upcoming. The developer's project page shows Coming Soon. One listing gives a launch date of January 2026, which the developer has not confirmed. |
| Location | NH-7, Banur, Mohali (SAS Nagar district), Punjab 140601 |
| Land and towers | About 15 acres, with 9 towers of S+28 floors each and a 7-storey clubhouse |
| Configurations | 3+1 BHK and 4 BHK apartments; super area of about 2,290 sq ft (3+1) and 2,890 sq ft (4 BHK) per listings |
| Total units | About 500 units, per one listing |
| Price | On request; no price band has been published |
| RERA | No RERA registration number has been published for the project |
| Possession | March 2029 per one listing; 2030 per another. The developer's site shows Soon, without a month or year. |
Project status and launch timing
MDB Elysium is marked as upcoming. The developer's project page for MDB The Elysium shows the project as Coming Soon as of 30 October 2026. A listing portal gives a launch date of January 2026, but no booking or launch event has been reported since then.
Listings use different names for the project, including MDB Elysium and Elysium. One listing labels it as a pre-launch project, but there is no RERA number or booking evidence behind that label.
Configurations and sizes
Listings describe the project as having 3+1 BHK and 4 BHK residences. The quoted super areas are about 2,290 sq ft for the 3+1 BHK and about 2,890 sq ft for the 4 BHK. Carpet areas have not been published, and buyers are advised by listings to confirm them with the sales team.
The developer's microsite lists 2 BHK and 3 BHK apartments and shows floor-plan images for those sizes. These do not match the 3+1 and 4 BHK figures in listings, so the configuration mix should be confirmed directly with the developer before any decision.
Listings say the layout is planned with Vastu-friendly orientation, wide balconies and large windows for light and cross-ventilation. Unit facing and orientation are to be confirmed by sales.
Pricing and buyer costs
Prices are on request, and no price band, price per square foot, payment plan or booking amount has been published. The developer's site states that the base price excludes GST, registration, stamp duty and other statutory charges.
- Stamp duty in Punjab is 7% for male buyers, 5% for female buyers, and 6% for joint male-female ownership.
- Registration is 1% of the property value, with a district cap in some areas.
- Both duty and registration are calculated on the higher of the agreement value or the circle rate. Mohali uses the same statewide rates.
RERA position
No RERA registration number has been published for MDB Elysium. The developer's project page refers to RERA registration without giving a number. One listing shows the RERA field as Update Soon. Buyers should ask for the registration number and check it on the Punjab RERA portal before committing.
Possession timeline
One listing gives March 2029, and another gives 2030 as the completion year. The developer's site shows possession as Soon, without a month or year. No construction stage has been published.
Location and connectivity
The project sits on NH-7, the Zirakpur-Rajpura Highway, next to D-Mart in Banur. The stretch links Zirakpur, Banur, Rajpura and Patiala. The developer's stated travel times are about 10 minutes to Chandigarh International Airport, 15 minutes to Chandigarh Railway Station, 15 minutes to ISBT Sector 43 Chandigarh, and 25 minutes to Kalka Shatabdi Railway Station.
Zirakpur is about 15 minutes away, and Mohali IT City about 15 minutes. No operational metro station is near the site. A Mohali metro extension is at proposal stage, with no confirmed funding or timeline as of mid-2026.
Nearby the developer lists Fortis Hospital Mohali and Alchemist Hospital Mohali at about 5 minutes each, PGIMER Chandigarh at 20 minutes, Delhi Public School Mohali at 5 minutes, Chitkara University at about 7 minutes, and DMart Mohali at 5 minutes.
Road and rail projects in the corridor
The Mohali IT City-Kurali expressway, a six-lane road of 31.23 km built at Rs 1,525.3 crore, has opened to traffic. It starts at IT City Chowk and runs to Kurali.
The Rs 3,167-crore Chandigarh-Ambala expressway is nearing completion. Its Ambala-side stretch, from Ambala to IT City Chowk over about 30 km, is reported to be likely to open on 15 December 2026, while the project remains under construction.
The Mohali-Sirhind expressway, phase 1 (27.37 km), is about 80% complete, with opening targeted for the end of 2026. The Banur corridor has 2,489 acres notified for expansion, a very long-term project with no completion year. A ring-road bypass around Mohali is at proposal and master-plan stage.
About the developer
MDB Group, also known as Metro Developers & Builders, was founded in 2012 and is based on VIP Road, Zirakpur. It has worked across Zirakpur, Mohali, Banur, Dirba, Moonak, Patiala, Patran and Sangrur, and has developed more than 150 acres of land. Its listed projects in Zirakpur include Metro Trade Centre, Metro Towers, Metro Kings Court and Metro Plaza City. The company is not listed on a stock exchange, and no RERA complaints against it have been found.
Planned amenities in listings and the developer's microsite include a swimming pool, a fully equipped gym, landscaped gardens, a jogging track, a community hall, a children's play area, 24/7 security and power backup. Listings also describe a clubhouse of about 1 lakh sq ft and about 5.5 acres of green open space, with walking paths and open lawns between towers. Specifications such as flooring, fittings and lift details have not been published.
Frequently asked questions
Is MDB Elysium open for booking?
As of 30 October 2026, the developer's project page shows the project as Coming Soon. No booking window or booking amount has been published.
What configurations does MDB Elysium offer?
Listings describe 3+1 BHK and 4 BHK apartments, with super areas of about 2,290 sq ft and 2,890 sq ft. The developer's microsite lists 2 BHK and 3 BHK units, so the mix should be confirmed with the developer.
Is MDB Elysium RERA registered?
No RERA registration number has been published for the project. The developer's page refers to RERA registration without giving a number, so buyers should ask for the number and check it on the Punjab RERA portal.
When is possession expected?
Listings give March 2029 and 2030 as possession or completion years. The developer's site shows possession as Soon.
How far is MDB Elysium from Chandigarh airport?
The developer gives about 10 minutes to Chandigarh International Airport, and about 15 minutes to Chandigarh city.
Is there metro access near the project?
No operational metro station is near the site. A Mohali metro extension is at proposal stage with no confirmed timeline.