New Launch · Kolkata
PS Numa in Tangra, Kolkata: New Launch on Matheswartola Road
PS Group has listed PS Numa, a residential project of two towers and 155 apartments on Matheswartola Road in Tangra, off EM Bypass, Kolkata. The project was launched in February 2026, and as of October 2026 its RERA record shows it as under construction, with completion scheduled for 15 February 2032.

| Project | PS Numa, residential apartments |
|---|---|
| Developer | PS Group Realty Private Limited |
| Location | Matheswartola Road, Tangra, off EM Bypass, Kolkata, West Bengal (PIN 700046) |
| Status | New Launch (launched February 2026); RERA status Under Construction as of October 2026 |
| RERA registration | WBRERA/P/KOL/2026/004041 (West Bengal RERA) |
| Scale | Two towers, 37 floors, 155 apartments on about 3.96 acres in one residential block |
| Configurations | 3 BHK (1,680 sq ft and 1,820 sq ft saleable), 4 BHK (2,280 sq ft saleable) |
| Price band | ₹1.25 Cr to ₹1.75 Cr plus applicable charges (listing data, undated) |
| Possession | RERA completion date 15 February 2032 |
| Parking | 554 covered car parking spaces and 200 mechanical parking spaces per RERA |
What has been launched
PS Numa is a residential project by PS Group Realty Private Limited, the flagship company of the PS Group. Listing data gives February 2026 as the launch month. A channel partner lists a 10% booking amount, but no specific booking-opening notice or formal launch announcement has been published.
The project is registered with the West Bengal Real Estate Regulatory Authority under WBRERA/P/KOL/2026/004041, as a single phase. The RERA record lists the project as under construction, which is the status used here as of October 2026. Because the launch took place less than 24 months ago, the project is classed as a new launch.
Layout and scale
The project comprises two towers of 37 floors each, with 155 apartments in one residential block. The RERA record gives the land area as 16,019 sq m, or about 3.96 acres. Density works out to roughly 39 units per acre.
The RERA parking count is 554 covered car parking spaces and 200 mechanical parking spaces.
Configurations and prices
Listing data shows three unit sizes. Saleable areas and base prices are set out below; charges are extra.
| Configuration | Saleable area | Base price |
|---|---|---|
| 3 BHK | 1,680 sq ft | ₹1.25 Cr |
| 3 BHK | 1,820 sq ft | ₹1.38 Cr |
| 4 BHK | 2,280 sq ft | ₹1.75 Cr |
Some listings describe 5 BHK and duplex units, but the sizes on those listings differ and no developer source confirms them, so they are not reported here.
The price per square foot in the September 2026 quarter, per listing trend data, is about ₹7,250. An earlier listing figure of ₹7,566 has been superseded. Listing data also gives a 10% booking amount. No payment plan, stage-wise schedule or offer has been published.
Specifications and amenities
Units are offered in a bare-shell finish, which leaves interior fit-out to the buyer. The structure is RCC frame with aluminium windows. Toilets have waterproofed screed floors, internal partition walls and tap-off and soil or waste lines. The kitchen has conduiting only. Balconies and terraces have tile flooring and painted walls. The specification lists a servant's room with tile flooring. Listing material gives different flooring details for the living and bedroom areas, so buyers should check the agreement for the final specification.
Listed amenities include a gymnasium, badminton court, jogging and cycle track, yoga area, swimming pool, kids' play areas, party and multipurpose halls, a central green with landscaped gardens, a clubhouse, 24x7 security, CCTV surveillance, lifts, power backup and treated 24x7 water supply.
Project material names SRSS as principal architect and Tectonix of Thailand as landscape designer.
Timeline and construction status
The RERA completion date is 15 February 2032, and developer listings give the same month for possession. As of October 2026, the project is registered as under construction. Because it is under construction, no occupation certificate or completion certificate applies yet.
The RERA record shows the promoter has uploaded a title certificate and an encumbrance declaration. The West Bengal RERA project record is the main reference for approvals and any changes to the timeline.
Location and connectivity
PS Numa sits on Matheswartola Road in Tangra, directly behind ITC Royal Bengal and with access from EM Bypass. The Science City area is nearby. Trade Fair Grounds Park is about 0.1 km away, Flemming Hospital about 0.5 km and Llr Public School about 0.7 km. CIT Road is about 3 km away.
New Town and Sector V, two IT hubs, are about 25 to 35 minutes away by car, according to project material.
Metro and road projects in the area
- Barun Sengupta (Science City) metro station, Orange Line: under construction on EM Bypass as of October 2026.
- Gour Kishore Ghosh metro station, Orange Line, Tangra: upcoming, with opening listed for 2026 (expected).
- Beleghata to Hemanta Mukhopadhyay and Sealdah to Esplanade metro sections: reported as formally opened by Gulf News, with the report date not shown.
- Kona Expressway: a six-lane elevated route of about 7 km, costing about ₹1,200 crore, linking Howrah and Kolkata. Deccan Herald reports the foundation stone has been laid.
The EM Bypass to New Town flyover, about 3 km from Tangra, and a Metro Line 2 extension to Teghoria are also listed as upcoming in local overviews.
Market context in Tangra
Per listing trend data, average asking prices in Tangra were about ₹9,800 per sq ft in September 2026, down from about ₹11,350 in December 2025. Comparable projects in Tangra include PS Montage, same developer, at about ₹10,950 per sq ft in June 2026 for 2 and 3 BHK units; GM Meena Galaxy, at about ₹9,500 per sq ft, with possession in June 2028; and Ruchi Active Acres, at about ₹8,580 per sq ft, under construction.
PS Aspirations Elixir, also by PS Group, lists 3 and 4 BHK units at ₹1.25 Cr to ₹1.59 Cr. Merlin X and Sriji Insignia list 3 and 4 BHK units in the ₹1.23 Cr to ₹2.85 Cr range.
About the developer
PS Group was founded in 1985 by Pradip Kumar Chopra and Surendra Kumar Dugar, according to Forbes India. Its flagship company, PS Group Realty Private Limited, was incorporated in 1988. The developer says it has delivered more than 150 projects and has over 100 joint ventures.
CARE Ratings assigned a rating of CARE A; Stable on the company's bank facilities, reaffirmed on 8 April 2026. CARE says the group completed over 200 lakh sq ft of construction over three decades. In April 2026, CARE recorded a plan to launch seven projects over the following 12 months, totalling about 52 lakh sq ft. Consolidated total operating income was ₹916.67 crore in FY2025, and overall gearing was 1.74x as of 31 March 2025.
PS Group's Kolkata projects include PS Reserve in Ballygunge, with possession from December 2022, and PS The Hazelton in Park Street, with possession from November 2023. The company is unlisted.
Frequently asked questions
Is PS Numa launched and open for booking?
PS Numa was launched in February 2026. Listing data shows a 10% booking amount, but no specific booking-opening date or formal launch notice has been published.
What configurations does PS Numa offer?
Listing data shows 3 BHK units of 1,680 sq ft and 1,820 sq ft saleable area, and a 4 BHK unit of 2,280 sq ft saleable area. Some listings mention 5 BHK and duplex units, but their sizes are not confirmed by the developer.
What is the price of PS Numa?
Listing data gives a price band of ₹1.25 Cr to ₹1.75 Cr, plus applicable charges. The 3 BHK 1,680 sq ft unit is listed at ₹1.25 Cr and the 4 BHK 2,280 sq ft unit at ₹1.75 Cr.
When is PS Numa due to be completed?
The RERA completion date is 15 February 2032, and developer listings give the same month for possession.
Under which RERA registration is PS Numa listed?
The project is registered with West Bengal RERA under WBRERA/P/KOL/2026/004041. The RERA record lists it as under construction.
How far is PS Numa from metro and road connections?
The Barun Sengupta (Science City) metro station on the Orange Line is under construction nearby on EM Bypass, and the Gour Kishore Ghosh station in Tangra is upcoming. The Kona Expressway's foundation stone has been laid, according to Deccan Herald.