New Cities India

Project launch

Raheja Lunaris listed as an upcoming residential project in Juinagar

Raheja Universal’s Raheja Lunaris is listed as an upcoming new-launch residential project in Juinagar, Navi Mumbai. Project material describes 1.5 and 2 BHK homes, with advertised prices starting at ₹98 lakh; published possession dates differ.

Realty News — Raheja Lunaris listed as an upcoming residential project in Juinagar
DeveloperRaheja Universal
LocationMIDC Industrial Area, Juinagar, Navi Mumbai
StatusUpcoming; also described in project material as a new launch
Configurations1.5 and 2 BHK apartments
Advertised starting price₹98 lakh
MahaRERA registrationP51700076867 is listed for Lunaris-1 / Callisto
PossessionPublished timelines differ: December 2030 is cited as the RERA-expected date, while a developer-linked page gives December 2028

Upcoming project and apartment mix

Raheja Lunaris is presented as an upcoming residential development by Raheja Universal in Juinagar. The project’s headline configuration offer is for 1.5 and 2 BHK flats. Project listings also identify separate 2 BHK options, including 452 sq ft and 649 sq ft carpet-area configurations; unit details and prices vary across published material.

The project is associated with Raheja District, the developer’s mixed-use township in Vashi NX. Township material describes residences, office space and retail, but these wider township figures should not be read as the scale of Raheja Lunaris alone.

Prices and possession timelines

Advertised starting prices begin at ₹98 lakh. Other project material gives a starting figure of ₹1.10 crore, while listings show different prices for particular configurations. These are published asking prices, and the available material does not give a common price date or a single consistent price schedule.

Possession dates also differ across project material. December 2030 is cited as the RERA-expected possession date, while a developer-linked Lunaris page lists December 2028. Buyers should distinguish these published timelines rather than treating them as one confirmed date.

Registration and project phases

MahaRERA number P51700076867 is associated with Lunaris-1, also identified as Callisto. A separate Lunaris-2 phase is listed under PR1331012501769. These are phase-specific references and should not be treated as interchangeable registrations for the whole development.

Juinagar location and connectivity

The project is located in the MIDC Industrial Area of Juinagar, near Juinagar railway station on the Harbour Line. The Sion–Panvel Expressway is also listed among nearby road links. These connections place the site within Navi Mumbai’s established rail and road network.

A further transport proposal is Metro Line 8, an approved corridor planned to connect Mumbai’s and Navi Mumbai’s airports. The proposed alignment is described as passing through Vashi, Sanpada and Juinagar along the Sion–Panvel Highway, with an expected launch in 2026–27. As of October 2026, this remains a planned infrastructure project, not an operational metro service.

Development phases

Lunaris-1 / CallistoPossession timelines published as December 2028 and December 2030MahaRERA registration P51700076867Lunaris-2Not statedListed separately under PR1331012501769

Frequently asked questions

Where is Raheja Lunaris?

It is listed in the MIDC Industrial Area of Juinagar, Navi Mumbai.

What apartment configurations are listed?

The project headline describes 1.5 and 2 BHK flats. Listings also give 2 BHK options with carpet areas of 452 sq ft and 649 sq ft.

What is the advertised starting price?

Published material gives a starting price of ₹98 lakh, while other project pages show different starting figures and configuration prices.

What is the possession timeline?

Published timelines differ: December 2030 is cited as the RERA-expected date, and a developer-linked page lists December 2028.

What is the MahaRERA number?

P51700076867 is listed for Lunaris-1 / Callisto. Lunaris-2 is listed separately under PR1331012501769.

Is Metro Line 8 operating near the project?

No. The proposed Line 8 is described as an approved project, with an expected launch in 2026–27; it is not described as an operational service.

Sources

Want the price sheet or a site visit?

Register once — we connect you with the developer’s sales team for this launch.