New Launch
The Reserve by Ramky launches 4 and 5 BHK villas in Harshaguda, Hyderabad
Ramky Estates is listing The Reserve by Ramky, a 99-villa project on 19.2 acres in Harshaguda, south Hyderabad, with 4 and 5 BHK units priced from a base of ₹8.5 Cr. The developer gives August 2030 as the possession date, and the site sits near Rajiv Gandhi International Airport.

| Developer | Ramky Estates and Farms Limited |
|---|---|
| Location | Harshaguda, Maheswaram mandal, Ranga Reddy district, Telangana (south Hyderabad) |
| Status (as listed) | New Launch |
| Product and configuration | 99 independent villas, 4 and 5 BHK, 5,500 to 8,000 sq ft, Vaastu-compliant |
| Land and phasing | 19.2 acres, one phase, one project-level RERA number |
| Base price band | ₹8.5 Cr to ₹12.49 Cr, plus other charges (not itemised in listings) |
| Possession (developer date) | August 2030 |
| RERA registration | P02400010049 |
Launch status and what is being offered
The Reserve by Ramky is listed as a New Launch on property portals and in the developer's project material. The project is a villa development rather than a tower scheme. It comprises 99 independent villas spread over 19.2 acres, with one clubhouse complex of 50,000 sq ft and about half the site kept as open area.
The developer describes the layout as Park Street inspired. Every villa is within a short walk of one of 10 themed pocket parks, and the parks are linked by landscaped green corridors and a central loop road. Listed villa features include private gardens, double-height dining areas, courtyards and terraces.
Configurations, sizes and price
The project offers 4 BHK and 5 BHK villas. Listings give a size range of 5,500 to 8,000 sq ft across the villa types. Five-bedroom floor plans are listed at 5,485, 5,615, 6,580, 7,495 and 8,060 sq ft.
The listed base price band is ₹8.5 Cr to ₹12.49 Cr, with other charges added on top. The charges are not itemised in the listings reviewed.
Home loans have been approved for the project by HDFC Bank and ICICI Bank. The developer's wider list of approved lenders for Ramky projects includes Bank of Baroda, State Bank of India, HDFC Bank, Axis Bank, Union Bank of India and ICICI Bank.
Possession, approvals and RERA
The developer's possession and completion date is August 2030. An earlier listing gave December 1, 2030, but that date is older and is superseded by the August 2030 figure.
The project is registered under RERA number P02400010049, which covers the whole project. The Telangana RERA portal is the state authority for Hyderabad projects. As of October 2026, the project is still under construction and the August 2030 handover is a future date.
Specifications and amenities
Listed specifications include a ground floor height of 12 ft 9 in and 11 ft 6 in on other floors. The main door is about 10 ft high with an engineered wood or hardwood frame. Living, dining, foyer and drawing areas are listed with Italian marble. Toilets have large-format vitrified tiles with anti-skid finish, and windows are three-track aluminium with mosquito mesh.
Amenities listed across the dual clubhouses include a swimming pool, gymnasium, badminton and squash courts, a multipurpose hall, home theatre, sports courts for tennis and basketball, wellness and yoga spaces, children's play zones, walking trails and community halls. Utilities listed include 24x7 water supply, rainwater harvesting, a sewage treatment plant, solid waste management and a sub-station. The community is gated.
Location and nearby infrastructure
Harshaguda is a village and panchayat in Ranga Reddy district, falling under Maheswaram mandal. The developer places the project near Rajiv Gandhi International Airport and the Tukkuguda area. Lakshmi Hospital is a commonly cited local landmark in Harshaguda.
Several metro projects affect the corridor. The 31 km Airport Metro Express from Raidurg to Rajiv Gandhi International Airport is part of the Phase II metro expansion, with expected completion between 2028 and 2030 according to the Hyderabad Metro Rail Limited programme. The Chief Minister has laid the foundation stone for the Raidurg to Shamshabad Airport connection.
Phase II-A includes a Nagole to airport corridor. Its detailed project report has been accepted in principle, and final clearances are still awaited. Phase II-B proposes longer corridors linking the airport to the planned Bharat Future City, and remains at the proposal stage. The Regional Ring Road, a 340 km expressway around the Hyderabad Metropolitan Region, is in the planning and land acquisition phase.
About the developer
Ramky Estates and Farms Limited was incorporated in 1994. The company says it has delivered more than 10 million sq ft of residential and commercial space, with 35 completed projects and 18 more in various stages of development. It operates in Hyderabad, Bengaluru, Chennai, Visakhapatnam and Warangal.
Its completed Hyderabad projects include The Huddle, with 326 units on 9.98 acres, finished in 2022. The group also lists Ramky Tranquillas in Gachibowli, a completed scheme of 105 villas. The company received the 2024 ET Excellence Award for Telangana in delivering high-quality constructions.
Frequently asked questions
Is The Reserve by Ramky a villa project or an apartment project?
It is a villa project. The listings describe 99 independent villas in 4 BHK and 5 BHK configurations, not towers or flats.
What is the price of a villa at The Reserve by Ramky?
Listings give a base price band of ₹8.5 Cr to ₹12.49 Cr, with other charges added on top. The charges are not itemised in the listings.
When is possession expected?
The developer gives August 2030 as the possession and completion date. This is a future date as of October 2026.
What is the RERA number for the project?
The project is registered under RERA number P02400010049. This is one registration for the whole project.
How close is the project to the airport and metro?
The developer places the project near Rajiv Gandhi International Airport. The 31 km Airport Metro Express from Raidurg to the airport is part of the Phase II expansion, with completion expected between 2028 and 2030.