Runwal has listed Phase III of The Central Park in Chinchwad, Pune, as a new launch, with 2, 3, 3.5 and 4 BHK apartments in a single tower and a MahaRERA registration. As of October 2026, the developer's page invites refundable expressions of interest, and listing sites give June 2027 as the possession target.

| Developer | Runwal Developers Limited (residential brand: Runwal Realty) |
|---|---|
| Location | Old Mumbai–Pune Highway, near Ranka Jewellers, Chinchwad, Pimpri-Chinchwad, Pune 411019 |
| RERA registration | MahaRERA P52100032101 (Phase III) |
| Status (as of October 2026) | Listed as a new launch; expressions of interest open on the developer's page; listing sites describe construction as under way |
| Configurations | 2, 3, 3.5 and 4 BHK apartments |
| Price band (developer page, undated) | 2 BHK from ₹1.28 crore; 3 BHK from ₹2.03 crore; 3.5 BHK from ₹2.40 crore; 4 BHK from ₹3.28 crore |
| Possession target | June 2027, per listing sites |
| Project scale | 0.19-acre Phase III plot with one tower of about 40 floors; the wider township covers 26 acres |
Launch status
Phase III is marketed as a new launch under the Runwal The Central Park name. The developer's Pune project page offers refundable expressions of interest and early-booking benefits, and it describes a limited offer for the first 100 buyers. Some listing sites still show the project as under construction, so the stage should be read as early-stage construction rather than a completed or occupied building. The project is registered with MahaRERA under P52100032101, which buyers can check on the state regulator's portal.
Configurations and prices
The developer lists 2, 3, 3.5 and 4 BHK apartments for the Phase III tower. Its Pune project page gives these figures for the wider project, which may differ from Phase III-specific plans:
- 2 BHK: 671 to 747 sq ft
- 3 BHK: 978 to 1,199 sq ft
- 4 BHK: 1,935 sq ft
Starting prices on the developer's page are 1.28 crore for 2 BHK, 2.03 crore for 3 BHK, 2.40 crore for 3.5 BHK and 3.28 crore for 4 BHK. The page does not give a date for these prices. Quoted prices generally exclude floor-rise charges, preferential location charges for park or podium-facing units, parking, GST, stamp duty and registration.
A third-party market estimate puts the project at about ₹15,250 per sq ft for the December 2025 to September 2026 period. Listing sites show different price ranges for Phase III, so buyers should check the current price sheet with the developer and the MahaRERA filing before committing.
Specifications and amenities
The developer lists granite kitchen counters with stainless steel sinks, branded sanitary fittings, branded modular concealed copper wiring, and provision for air-conditioning in the living room and bedrooms. The project-wide amenity list includes a clubhouse of about 40,000 sq ft, a swimming pool, a gym, a yoga deck, a children's play area, a jogging track and about 5 acres of open space. Listed services include 24-hour water supply, 24-hour backup power for common areas, CCTV, rainwater harvesting and a sewage treatment plant.
Location and connectivity
The developer says the Old Mumbai–Pune Highway is about two minutes away, the PCMC metro station about three minutes, Chinchwad railway station about five minutes and Pune International Airport about 30 minutes. The Purple Line of Pune Metro has been fully operational from PCMC to Swargate. Currently, the 17.4-km Purple Line connecting PCMC and Swargate is operational, serving 14 stations.
Nearby services named on listing sites include the Federal Bank branch, City One Mall, Premier Plaza Mall and dental and multispecialty hospitals in Nigdi and Chinchwad. Chinchwad is described as an industrial base with automotive, pharmaceutical and electrical manufacturing.
Infrastructure coming up
The PCMC–Nigdi metro extension is the nearest planned transit upgrade. Maharashtra Metro Rail Corporation Limited (MahaMetro) has awarded a ₹78.5 crore contract for station facility works on the proposed elevated Metro extension from PCMC to Nigdi. The contract has been granted to Colossus Infra Projects Private Limited, with completion expected within about 18 months. Four elevated stations — Chinchwad, Akurdi, Nigdi, and Bhakti-Shakti — have been approved along the proposed route. The total cost is estimated at approximately ₹1,048 crore.
A longer corridor between Bhakti-Shakti Chowk and Chakan is still at the proposal stage. The revised proposal covers 45.295 km and 34 stations at an estimated project cost of ₹12,937.23 crore. Of the 34 proposed stations, 28 would be located within Pimpri-Chinchwad, while the remaining six would come under the jurisdiction of Chakan Municipal Council.
On the road network, the state told the legislature that the western section of the Pune Ring Road will be completed by 2026, while the eastern section is scheduled for completion by 2028. The remaining three packages are currently awaiting administrative approval. Those dates were reported in late 2025 and may have moved since.
The Purandar greenfield airport is still at the land-acquisition stage, with construction expected to start in December 2026.
Developer background
Runwal Group was founded in 1978 by Subhash Runwal. Runwal Developers Limited markets its residential brand as Runwal Realty, led by Sandeep Runwal. The group reports 35 completed projects and 11.22 million sq ft delivered. Its Pune projects include Runwal Swaranjali in Baner, Runwal Sankalp in Kothrud and Runwal Park in Gultekdi. A separate listing names a different Runwal entity as developer of this project, so buyers should confirm the registered promoter on the MahaRERA portal.
Frequently asked questions
Is Runwal The Central Park Phase III registered with RERA?
Yes. The project is registered with the Maharashtra Real Estate Regulatory Authority (MahaRERA) under P52100032101, and buyers can verify the registration on the state portal.
What configurations are offered in Phase III?
The developer lists 2, 3, 3.5 and 4 BHK apartments for the Phase III tower.
What is the expected possession date?
Listing sites give June 2027 as the possession target. The developer's page does not give a separate date, and the RERA filing should be checked for the registered completion date.
How far is the Chinchwad metro station?
The developer says the PCMC metro station is about three minutes away. The Purple Line has run from PCMC to Swargate since September 2024.
When will the PCMC–Nigdi metro extension open?
A contract for station facility works was awarded in February 2026 with about 18 months for completion, but the opening date for the extension has not been announced.