Meraki The Soul Villas in Joka, Kolkata: Status, Configurations and Location
Meraki The Soul Villas is a 97-villa residential project by the Salarpuria Sattva Group on Bakrahat Road in Joka, South Kolkata. Project listings describe it as under construction, with 3 and 4 BHK villas and a developer-stated possession target of March 2027.

| Developer | Salarpuria Sattva Realty LLP, part of the Salarpuria Sattva Group |
|---|---|
| Location | JL No 15, Mouza Raspunja, Bakrahat Road, Joka, Kolkata 700104, South 24 Parganas, West Bengal |
| Product and units | 97 individual villas (3 BHK and 4 BHK), no towers; ground plus one floor per most listings |
| Configurations | 3 BHK: 1,520 sq ft built-up, 54 units in Phase 1. 4 BHK: 1,639 sq ft built-up, 43 units in Phase 1 (per the September 2023 project brief) |
| Price band | ₹85 lakh to ₹98 lakh, per a listing last updated 19 May 2025; one listing quotes a base from ₹96.72 lakh plus extra charges |
| Possession | March 2027 (developer's date as given in listings) |
| RERA registration | WBRERA/P/SOU/2023/000076 (West Bengal RERA), as cited by listing pages |
| Status | Under construction, as shown on several listing pages as of October 2026 |
Project status and developer
As of October 2026, several project listings show Meraki The Soul Villas as under construction. Some listing portals still tag it as a new launch, so the stage should be read as the developer's own timeline rather than a confirmed completion point.
The developer behind the project is Salarpuria Sattva Realty LLP, a limited liability partnership registered in Kolkata in 2014. The project is marketed under the wider Salarpuria Sattva Group name. The group says it began its Kolkata work in 1985 and has delivered landmark towers and branded hotels in the city, including the JW Marriott and Novotel properties.
Scale, configurations and price
The project is a low-rise villa township rather than an apartment block. A 2023 project brief for Phase 1 lists 54 three-BHK villas of 1,520 sq ft built-up and 43 four-BHK villas of 1,639 sq ft built-up, along with a separate two-storey clubhouse of about 21,000 sq ft.
Some pages cite 4.84 acres for the 97 villas, others describe Phase 1 as spanning 6 acres within a wider 17-acre master plan. Price pages quote a band of ₹85 lakh to ₹98 lakh for the 3 and 4 BHK villas.
Specifications and amenities
Listing pages describe an RCC frame structure, vitrified tiles in the bedrooms, living and dining areas, and anti-skid ceramic tiles in the kitchen, balconies and toilets. Windows are anodised aluminium, doors are laminated flush doors in wooden frames, and electrical wiring is concealed with modular switches.
Shared facilities listed by the developer include a swimming pool, a gym, indoor games, a children's play area, a cricket pitch, a badminton court, a jogging track, a banquet hall and a library-cum-cards room. Services mentioned include 24-hour power backup and water supply, rainwater harvesting, a water treatment system, solar panels on the clubhouse roof and 24x7 security with CCTV. Each villa has a front and back lawn, and the developer describes three open sides for every unit.
Approvals
The project carries the West Bengal RERA registration WBRERA/P/SOU/2023/000076, which appears on multiple listing pages. The registration date and the status of the completion and occupancy certificates were not stated in the materials reviewed, so buyers should check the state regulator's portal directly for the latest filings.
Location and connectivity
The site lies off Bakrahat Road in Joka, an area on the southern edge of Kolkata within South 24 Parganas. The developer's Kolkata page places the project near the Indian Institute of Management Calcutta and the ESI medical college campus in the same neighbourhood, under the Kolkata Municipal Corporation.
Joka is served by the Purple Line of the Kolkata Metro. Passenger services currently run on the Joka to Majerhat section, and the line's Joka terminus was opened in late December 2022. Diamond Harbour Road, a major arterial route, runs along the corridor.
Metro extension and infrastructure
The Ministry of Railways has begun land acquisition for a 1.7 km extension of the Purple Line from Joka to Diamond Park via IIM Calcutta. A gazette notification covers about 5,871 sq m of private land across Sarmasterchak, Hanspukuria and Joka, and affected owners were given 21 days to raise objections before a final order is issued.
Rail Vikas Nigam Limited has floated a tender of about ₹378 crore for the viaduct and station, which includes 44 pillars and a station box. The project is targeted for completion within 30 months of the land being handed over. Construction is scheduled to begin only after the land and right-of-way are transferred, so the timeline is not yet fixed. Separately, work on the wider Joka to Esplanade corridor, about 14 km in length, is under way on the remaining sections.
Frequently asked questions
Is Meraki The Soul Villas under construction or still upcoming?
Several listing pages describe the project as under construction as of October 2026. Some portals still tag it as a new launch, so the current stage should be confirmed with the developer or the state regulator.
What configurations are offered?
The project offers 3 BHK and 4 BHK villas. The 2023 Phase 1 brief lists 54 three-BHK villas of 1,520 sq ft built-up and 43 four-BHK villas of 1,639 sq ft built-up.
What is the price range?
Project listings quote ₹85 lakh to ₹98 lakh for the villas, with one listing giving a base from ₹96.72 lakh plus additional charges. These are listing figures and may have changed since they were last updated.
When is possession expected?
The developer's date given in listings is March 2027. Some listings give other dates, so the possession schedule should be confirmed in the sale agreement.
What is the RERA registration number?
The project is listed under West Bengal RERA registration WBRERA/P/SOU/2023/000076.
How far is the metro and when will the Joka extension start?
Joka is the southern terminus of the operational Purple Line section to Majerhat. The 1.7 km extension to Diamond Park is at the land acquisition stage, and construction will start only after the land is handed over, with completion targeted within 30 months of that point.