Upcoming Project
Vivaan Atrium in Zundal: Upcoming 2BHK and 3BHK Project on Ahmedabad's Ring Road Corridor
Vivaan Atrium, a residential project by Vivaan Group in Zundal, Ahmedabad, is listed as upcoming. It plans 2BHK and 3BHK apartments in four towers on a 1.09-acre site, with listed all-inclusive prices of 56.00 lakh to 80.00 lakh and a target possession of December 2029.

| Developer | Vivaan Group |
|---|---|
| Location | Off Monarc Nexus Road, near the Ahmedabad–Palanpur highway, Divine Circle, Zundal, Ahmedabad, Gujarat |
| Status (as of 30 Oct 2026) | Upcoming; construction 1% complete as of 8 Aug 2026 |
| Layout | 1.09 acres; four towers of B3+G+14 floors; four flats per floor served by two lifts and one staircase |
| Configurations | 2BHK and 3BHK apartments; no plots, villas or offices |
| Listed prices (all-inclusive) | 2BHK 56.00 to 64.00 lakh; 3BHK 68.00 to 80.00 lakh, per listing data updated 8 Aug 2026 |
| Minimum down payment | 8.00 lakh for the smallest 2BHK; 10.00 lakh for the larger 2BHK |
| Target possession | December 2029 |
| RERA registration | Not yet registered with Gujarat RERA (GujRERA) as of 30 Oct 2026 |
What is planned
Vivaan Atrium is planned as four towers of basement, ground and 14 upper floors on a 1.09-acre parcel off Monarc Nexus Road in Zundal. Listing data describes four flats per floor, served by two lifts and one staircase. The site lies near the Ahmedabad–Palanpur highway.
The project is listed as upcoming. Listing data records construction at 1% complete as of 8 Aug 2026. Listing data also describes limited open space across the site, given four towers on 1.09 acres.
Configurations, sizes and prices
| Type | Carpet area | Built-up area | All-inclusive price |
|---|---|---|---|
| 2BHK | 716 sq ft | 1,377 sq ft | 56.00 lakh |
| 2BHK | 819 sq ft | 1,575 sq ft | 64.00 lakh |
| 3BHK | 880 sq ft | 1,692 sq ft | 68.00 lakh |
| 3BHK | 1,011 sq ft | 1,944 sq ft | 80.00 lakh |
Listed prices include stamp duty, registration, GST and possession charges. Each unit carries one basement parking space.
Payment plan and possession
The listed payment plan is the Construction Link Plan, with payments in slabs tied to construction progress. Listing data says loans of up to 90% are available. Stage-by-stage percentages are not yet published in the listing data.
The developer's target possession is December 2029. The listing platform gives 1 December 2029 as the date in its FAQ.
Approvals and RERA status
As of 30 Oct 2026, the project is not yet registered with Gujarat RERA. Listing data cites a commencement certificate as in hand. The occupancy certificate is to be applied for closer to possession. Listing data reports no litigation against the project.
Listing data names ten banks as having approved the project for home loans: Central Bank of India, Union Bank of India, Bank of India, Bank of Baroda, Citi Bank, Kotak Mahindra Bank, Axis Bank, State Bank of India, ICICI Bank and HDFC Bank.
Amenities and specifications
Listed amenities include a community clubhouse, a landscaped garden, a gymnasium, a fitness deck, basement parking and what the listing describes as advanced security. Listing data lists vitrified floor tiles in the living areas, granite kitchen platforms with stainless steel sinks, and aluminium sliding windows. Listing data highlights spacious balconies as a key feature of the design.
Location and connectivity
The project is in Zundal, on the Ahmedabad side of the Sardar Patel Ring Road, a 76 km toll road that lists Zundal among its major junctions. CBD Mall sits on the ring road in Zundal, and Vivaan's corporate office is opposite it. Chandkheda Road railway station is the nearest rail station in the locality, according to a nearest-station listing for another Zundal project.
Nearby places
- Puna International School, about 750 m
- Divine Child International School, about 2.2 km (locality reference)
- Zundal Circle junction, about 2 km
- CBD Mall, about 2.8 km
- KD Hospital, about 3.4 km (locality reference)
Infrastructure coming up
Ahmedabad Metro Phase 3 has been approved by the Public Investment Board. It is a 60 km network with 41 elevated stations, including the Thaltej Gam–Godhavi–Badrabad corridor along the Sardar Patel Ring Road. The Union Cabinet's final approval is still pending, as of 30 Oct 2026.
Ahmedabad Metro Phase 2A, from Koteshwar Road to the airport, has been approved by the Union Cabinet. It is a 6.032 km stretch with five stations. Ahmedabad Metro Phase 2 was completed in January 2026. Badrabad is planned near the Ahmedabad–Dholera expressway.
Comparable projects in the area
Other Vivaan Group projects in Zundal listed with prices include Vivaan Aura at 62.00 to 76.00 lakh (2BHK and 3BHK), Vivaan Orbit at 66.00 to 85.00 lakh (2BHK and 3BHK, possession July 2027), Vivaan Oliver at 79.00 lakh (3BHK, possession July 2027), Vivaan Solitaire and Vivaan Ixora at 80.00 lakh each (3BHK, ready), and Vivaan Essence at 64.00 lakh (2BHK, ready).
Non-Vivaan 3BHK listings nearby include Shreeji Sarvatra at 75.00 lakh (possession December 2027), Sakar Prime at 79.70 lakh (possession December 2028), Kadamb Parisar at 82.00 lakh (possession June 2028) and Suhaal Sparsh at 83.82 lakh for 1,908 sq ft (possession December 2029).
About the developer
Vivaan Group's project listings describe five years of experience and four completed projects in Ahmedabad. Listing data shows Vivaan Elysium and Vivaan Elementos in Zundal as ready to move, with possession dated March 2023.
The developer's website lists its projects in Ahmedabad and says it has a record of timely delivery.
Frequently asked questions
Is Vivaan Atrium registered under RERA?
As of 30 October 2026, the project is not yet registered with Gujarat RERA (GujRERA).
What configurations are planned at Vivaan Atrium?
The project plans 2BHK and 3BHK apartments in four towers. Listed carpet areas run from 716 to 819 sq ft for 2BHK and from 880 to 1,011 sq ft for 3BHK.
What are the listed prices?
Listing data, updated 8 August 2026, shows 2BHK units at 56.00 to 64.00 lakh and 3BHK units at 68.00 to 80.00 lakh, all-inclusive of taxes and charges. The minimum down payment is 8.00 lakh for the smallest 2BHK.
When is possession expected?
The developer's target possession is December 2029.
How far along is construction?
Listing data records construction at 1% complete as of 8 August 2026.
Which metro projects are planned near Zundal?
Ahmedabad Metro Phase 3 includes a corridor along the Sardar Patel Ring Road and is awaiting the Union Cabinet's final approval. Phase 2A to the airport has been approved by the Union Cabinet. Phase 2 was completed in January 2026.