Planning and Land
NAINA works launched in Third Mumbai as Uran bypass opens in Raigad
The Maharashtra government launched development works in the Navi Mumbai Airport Influence Notified Area (NAINA) on Sunday, 25 October 2026, and inaugurated a bypass for Uran in Raigad district. Chief Minister Devendra Fadnavis said the zone could generate about 15 lakh jobs, with local residents given first access.

| Date of event | Sunday, 25 October 2026 |
|---|---|
| Location | NAINA region, Navi Mumbai Airport Influence Notified Area, Raigad district |
| Led by | Chief Minister Devendra Fadnavis with Deputy Chief Ministers Eknath Shinde and Sunetra Pawar |
| Projected jobs | About 15 lakh in total, including 5 lakh high-paying roles and 10 lakh basic-to-intermediate roles (government projection) |
| Land pooling terms | Farmers surrender 60% of their land and receive 40% back as developed plots |
| Area and villages | 225.59 square kilometres covering 94 villages; notified in 2013 |
| Planning authority | CIDCO, acting as Special Planning Authority |
| Airport status | Navi Mumbai International Airport began commercial operations in December 2025 |
What was launched
Chief Minister Devendra Fadnavis, joined by Deputy Chief Ministers Eknath Shinde and Sunetra Pawar, opened a set of connectivity projects and started infrastructure works in NAINA on Sunday. The event also marked the opening of the Uran bypass in Raigad district, which some reports describe as a road and others as a bridge. Fadnavis described the wider area as the 'Third Mumbai' and said it would act as a main growth driver for Maharashtra over the next five decades.
CIDCO, the state planning body for the zone, said the goal is a planned, inclusive and sustainable model of development. Its infrastructure package named SBR-9 (a stilt bridge), BR-4, BR-5 and the Uran city bypass. Officials expect these works to ease congestion and support business activity around the airport.
Jobs and local priority
Fadnavis put the employment target at about 15 lakh jobs. Of these, five lakh would be high-paying positions, and ten lakh would be at basic and intermediate levels. He said residents of the area should get the first claim on these openings, which he described as belonging to the sons and daughters of the soil.
The Chief Minister also argued that the airport should be seen as an economic multiplier that lifts the region's output, not only as an aviation facility. He named Thane, Navi Mumbai, Raigad and Palghar as districts that would become important engines of state growth. These jobs figures are the government's projection. No timetable for hiring was given at the event.
Land documents and the farmer process
The government said land documents would be handed to landholders before development works begin. Before that step, CIDCO carried out village-wise surveys, plot identification, checks of ownership records and preparation of the necessary papers. Fadnavis said the distribution has started and that problems are being resolved village by village.
Under the land-pooling scheme, farmers give up 60% of their land and receive 40% as developed plots. The Chief Minister acknowledged that farmers feared they would lose out, and that this fear had slowed the project. To address this, the state authorised CIDCO to correct errors in the final development plan, including overlapping plots, wrong plot numbers and mismatches in ownership records.
CIDCO has also published a booklet setting out the entitlements of project-affected people, covering developed plots and floor space index. Fadnavis said the state has removed development fees and betterment charges for landholders. It is also finalising freehold procedures so that ownership is recorded on property cards.
Roads, water and what comes next
Fadnavis said travel between Worli and the airport could become signal-free within six to eight months, with Atal Setu and other proposed road links adding capacity. Water supply schemes at Poshir and Shilar have been approved, and Kondhane is under consideration to meet future demand in Raigad and Thane.
The works are part of a larger programme that began with tenders in 2024. At that time CIDCO floated tenders worth about Rs 3,115 crore for roads, bridges, underpasses, streetlights and drains. It said it planned to spend about Rs 14,300 crore over ten years in the area. Its officials said the work would be completed in three years once tendering was finished.
From here, the immediate steps are the continued handover of land documents village by village, the correction of plot records, and progress on the road and water projects. The government has said it will stay available to farmers until their grievances are resolved.
Frequently asked questions
What is NAINA?
NAINA is the Navi Mumbai Airport Influence Notified Area, a zone around Navi Mumbai International Airport in Raigad district. It was notified in 2013, covers 225.59 square kilometres and 94 villages, and CIDCO acts as its Special Planning Authority.
What did the Chief Minister announce on 25 October 2026?
Fadnavis launched development works in NAINA and inaugurated the Uran bypass. He said the zone could create about 15 lakh jobs, including five lakh high-paying roles, and that local residents should get first access.
How does the land-pooling scheme work?
Farmers surrender 60% of their land and receive 40% back as developed plots. The government has authorised CIDCO to correct errors in the final plan and records before land documents are handed over village by village.
Is the 15 lakh jobs figure a confirmed outcome?
It is the Chief Minister's projection for the full development of the region. It is a target over the coming decades, not a count of jobs already created.
Which roads and water projects are linked to NAINA?
Works named at the event include SBR-9, BR-4, BR-5 and the Uran city bypass. Water supply schemes at Poshir and Shilar have been approved, and Kondhane is being considered for future demand.
Sources
- Fadnavis Unveils Development Push For Third Mumbai
- Navi Mumbai airport-centred NAINA to generate 15 lakh jobs, locals to get first right: Fadnavis
- NAINA Project To Create 15 Lakh Jobs, Including 5 Lakh High-Paying Positions, Says Maharashtra CM Devendra Fadnavis
- Navi Mumbai's airport influence zone set to create 15 lakh jobs including five lakh premium roles
- Navi Mumbai airport-led project to create 15L jobs: Devendra Fadnavis
- NAINA's Growth Plan: Airport Connectivity, Uran Bypass and Water Supply to Transform 'Third Mumbai'
- ₹3,115-crore tenders floated to develop NAINA'S infrastructure