Bhubaneswar New City Connectivity: Airport, Roads, Rail and Metro Status

Bhubaneswar New City, also searched as the Gothapatna-Malipada-Daspur Township or New Bhubaneswar Township, is a planned greenfield township of about 800 acres on the western fringe of Bhubaneswar, approved by the Odisha Cabinet on 10 September 2025 and steered by the Bhubaneswar Development Authority (BDA). As of the latest BDA update in August 2026, the township is still in the planning stage, and its links rest mainly on the existing city: Biju Patnaik International Airport about 8-12 km away, a proposed four-lane approach road from Naka Gate Square to Kateni, and a metro line that has stalled.

Bhubaneswar New City (New City Development Scheme) — Bhubaneswar New City Connectivity: Airport, Roads, Rail and Metro Status
LocationGothapatna, Malipada and Daspur mouzas, within the Bhubaneswar Development Plan Area, Khordha district, Odisha (as of August 2026)
Nearest airportBiju Patnaik International Airport (BBI), operational; about 8-12 km by road from the site (locality-level estimates, as of November 2026)
Nearest railway stationBhubaneswar Railway Station, about 12-14 km by road (locality distance data, as of November 2026)
Approach roadProposed four-lane road from Naka Gate Square to Kateni, announced by BDA in November 2024; no construction start date confirmed
Puri expresswayProposed six-lane Bhubaneswar-Puri expressway, floated in 2023; passes the wider city periphery, not the township site; no construction start date set (as of November 2026)
MetroBhubaneswar Metro Phase 1 (Trisulia Square to airport) is stalled and under inter-ministerial review as of February 2026
Township stagePlanning stage; Detailed Project Report expected within nine months of May 2026 (as of August 2026)

Airport access: Biju Patnaik International Airport

The township has no airport of its own, and none is proposed on the site. The nearest air link is Biju Patnaik International Airport (BBI) in Bhubaneswar, which is fully operational. Locality-level distance estimates place it roughly 8-12 km from the Gothapatna-Malipada-Daspur area, depending on the plot and route.

The airport opened in 1962 and handled more than 5.15 million passengers in 2025, its highest annual traffic on record. That put it among the busier airports in the country. As of June 2026, it was connected to 24 domestic and four international destinations.

A new integrated Terminal-3, estimated at Rs 1,000 crore, is planned but still needs approval from the Airports Authority of India before construction. Until that approval comes through, the existing terminal remains the only passenger facility.

Expressway: Bhubaneswar to Puri six-lane proposal

The Odisha government floated a proposal in 2023 for a new six-lane expressway linking Bhubaneswar and Puri. It would connect BBI with a proposed airport near Puri, cut the travel distance by 9 km from the current 66 km, and reduce travel time by about 30 minutes.

The expressway would run along the western and southern periphery of Bhubaneswar, not through the New City site itself. Status: proposed. No construction start date has been set as of November 2026.

Approach road: Naka Gate Square to Kateni

The main connectivity commitment made specifically for the township is a dedicated approach road. In a November 2024 statement issued when land acquisition began, BDA said a four-lane road would be built from Naka Gate Square to Kateni for better communication to and from the New City, along with connecting roads to manage traffic congestion.

The idea builds on an earlier state tender. The Works Department of the Government of Odisha floated a tender in 2022 to improve the Naka Gate to Kateni stretch in Khordha district to four-lane standard, from chainage 3/500 km to 8/640 km, under the Central Road Development Programme. Status: proposed for the New City's benefit. No completion date or construction start has been confirmed for the segment serving the township.

Existing roads around the township

The site sits on the western fringe of the city and is served by local roads such as Gothapatana Road. Locality data also lists National Highways NH316 and NH57 as reachable highways in the wider vicinity. These routes run past the general area rather than through the New City site.

Internal roads for the township itself will be laid out in the master plan. The first five-year budget, from 2025-26 to 2029-30, allocates Rs 1,342 crore for land acquisition, road construction, core utility infrastructure and public amenities. That figure covers the whole scheme's early phase, not a road-by-road programme.

Rail links

The township has no railway line, station or freight corridor of its own. As of mid-2026, the published plans name none for Gothapatna-Malipada-Daspur.

The nearest major rail hub is Bhubaneswar Railway Station, roughly 12-14 km away by road according to locality distance data. Bhubaneswar is an established junction on the East Coast Railway network, and that connectivity serves the existing city. It was not built for the New City.

Metro and public transport plans

BDA's statement for the township, issued in November 2024, says the city will be served by Mo Bus, a service of e-buses only, along with connectivity to the Bhubaneswar Metro. The e-bus service is a plan, not a running service.

The Bhubaneswar Metro is a separate, city-wide scheme. Its Phase 1 alignment would run from Trisulia Square to Biju Patnaik Airport over 26.024 km with 20 elevated stations, at an estimated cost of Rs 5,926.38 crore. The Odisha government approved it on 14 November 2023, and the foundation stone was laid on 1 January 2024 with a four-year deadline.

The project has since stalled. In July 2025 the state scrapped the tender with Delhi Metro Rail Corporation over viability concerns. As of a February 2026 legislative update, the project remained under state scrutiny, and an inter-ministerial committee was re-evaluating its feasibility under the National Metro Rail Policy. As of 31 December 2025, Rs 273.51 crore (unaudited) had been spent on the initiative. Status: proposed, stalled.

Master plan and timeline for the road and transit network

The township's road and transit network will be set out in the master plan being prepared by Singapore's Surbana Jurong Infrastructure, under an MoU signed with BDA on 17 January 2025. The scope agreed in January 2026 covers prioritising projects into short, medium and long-term phases.

A topographic and LiDAR survey of the roughly 800-acre area was tendered in July 2026, with the tender closing on 24 July 2026. BDA issued Form-III and Form-IV notices on 21 July 2026 for Town Planning Schemes 05/2026, 06/2026 and 07/2026, covering about 863 acres across Malipada and Daspur, which starts a two-month window for landowners to declare their rights. The Detailed Project Report is expected within nine months of May 2026, which means by early 2027.

Developer and planning record

The Bhubaneswar Development Authority is the nodal agency for the New City. It is the city's statutory development body and has been issuing planning declarations and approvals for the wider Bhubaneswar Development Plan Area. At its 152nd Authority Meeting on 1 August 2026, chaired by Housing and Urban Development Minister Dr Krushna Chandra Mahapatra, it reviewed the New City and Bhubaneswar Town Centre progress and expressed satisfaction, with no new approval or budget change for the township.

The master planner, Surbana Jurong Infrastructure Pvt Ltd of Singapore, has a record of large urban planning assignments. Its role here is consultancy and advisory support for the master plan.

Locality context for buyers

The Gothapatna-Malipada-Daspur belt sits inside the Bhubaneswar Development Plan Area, so it draws on the existing city's airport, rail and road network today. Buyers should read the township's connectivity as a plan that depends on several projects still at proposal or planning stage: the approach road, the Puri expressway and the metro. Each one has a different level of certainty, and none is complete.

The township's development model is transit-oriented, and the early budget is small compared with the Rs 8,179 crore, 15-year total estimate for the scheme as a whole, which combines public and private funding.

Development phases

Frequently asked questions

How far is Bhubaneswar New City from the airport?

Bhubaneswar New City is roughly 8-12 km from Biju Patnaik International Airport, according to locality-level distance estimates. The airport is fully operational.

Is there a metro to Bhubaneswar New City?

No metro line serves the township today. The Bhubaneswar Metro Phase 1 line to the airport is proposed and stalled, and it was under inter-ministerial review as of February 2026.

Which road will connect the New City to the highway network?

BDA has announced a four-lane approach road from Naka Gate Square to Kateni for the township. It is at the proposal stage, and no construction start has been confirmed.

Is there a railway station near Bhubaneswar New City?

Bhubaneswar Railway Station is the nearest major rail hub, about 12-14 km away by road. The township has no railway line or station of its own in the published plans.

When will the Bhubaneswar to Puri expressway be built?

The six-lane Bhubaneswar to Puri expressway is a 2023 proposal that would pass the city's periphery rather than the township. No construction start date has been set as of November 2026.