New Cities India

INFRASTRUCTURE

HSIIDC's Global City Gurugram Gets Multi-Highway Connectivity Push

Haryana's flagship Global City mixed-use township in Gurugram is set to receive comprehensive multi-route highway connectivity, with a grade-separated interchange directly linking it to the Dwarka Expressway and new arterial roads connecting to NH-48, Pataudi Road, and the Kundli-Manesar-Palwal (KMP) Expressway. The move aims to prevent traffic congestion and unlock real estate investment as the 1,000-acre project scales up toward its December 2026 Phase 1 completion target.

Global City Gurugram — HSIIDC's Global City Gurugram Gets Multi-Highway Connectivity Push
Project Size1,002 acres across Sectors 36, 36B, 37, 37A, and 37B, Gurugram
Development AuthorityHSIIDC (Haryana State Industrial and Infrastructure Development Corporation)
Highway ConnectionsDwarka Expressway (grade-separated interchange + underground link), NH-48 (via Narsinghpur arterial road), Pataudi Road, KMP Expressway
Phase 1 Scope587 acres of trunk infrastructure (roads, drainage, utilities, 350-million-litre water reservoir)
Phase 1 Investment₹940 crore
Phase 1 Target CompletionDecember 2026
Total Project Investment Potential₹1 lakh crore (~$15 billion)
Projected Jobs (Full Build-Out)Over 5 lakh (500,000+) jobs
Full Project Completion2035
Land Use Mix56.08% commercial, 40.05% residential, 2.73% institutional, 1.14% utility

What Changed: Multi-Route Access Strategy

The Global City mixed-use township, being developed by HSIIDC, is set to receive a wide-ranging network linking it to major NCR highways: the Dwarka Expressway, NH-48 (Delhi-Jaipur Highway), Pataudi Road and the KMP Expressway, with multi-route access intended to head off future traffic congestion as the project scales up. A grade-separated interchange and underground link will connect Global City directly to Dwarka Expressway, while a new wide arterial road near Narsinghpur will provide a direct link to NH-48.

This represents a shift in the township's infrastructure strategy from single-corridor dependency to a multi-nodal connectivity model.

Who Decided and When

The HSIIDC-led project is set to receive this push via a wide-ranging network planned to link it with major NCR highways, with multi-route access intended to head off future traffic congestion as the project scales up. The announcement was published as of 31 July 2026 (today), confirmed through official HSIIDC statements and Haryana government review meetings chaired by Industry and Commerce Minister Rao Narbir Singh.

The Numbers: Scale and Investment

Global City Gurugram is a 1,002-acre smart township developed by HSIIDC in Sectors 36-37D along Dwarka Expressway, integrating residential, commercial, and institutional zones, and projected to create 5.2 lakh jobs and house 1.8 lakh residents with 125+ amenities.

It is being positioned as the Central Business District of the NCR, carrying an investment potential of around Rs 1 lakh crore (roughly $15 billion) and projected to generate over five lakh jobs once fully operational.

Phase 1 (587 acres) will be completed by December 2026 with ₹940 crore infrastructure investment. The first phase covers 587 acres and focuses entirely on building roads, drainage systems, underground utility corridors, power supply infrastructure, and a 350-million-litre water reservoir.

What It Changes: Real Estate and Traffic Impact

Experts said the improved connectivity is likely to further boost real estate investment in surrounding sectors, even as they stressed that Global City's long-term success will depend on holistic, climate-resilient urban planning rather than road links alone. The Dwarka Expressway connectivity has driven 15-20% property appreciation in surrounding areas, with prices doubling over the past four years.

Urban transport experts said large greenfield projects need multiple entry and exit points rather than dependence on a single highway, which would ease congestion, aid emergency response and improve freight movement, but cautioned that road-widening alone will not ensure sustainable mobility, calling for parallel investment in mass transit, and infrastructure for pedestrians and cyclists.

What's Next: Phase Completion and Build-Out Timeline

Work on the first phase began last year and is targeted for completion by the end of 2026, with full build-out envisioned through 2035. As of early 2026, roughly 20% of Phase 1 work is complete, and Chief Minister Nayab Singh Saini has officially confirmed a December 2026 target for Phase 1 completion.

Global City is being planned in Gurugram on Dwarka Expressway as a world-class futuristic city based on live, work, and play with a transit-oriented walk-to-work based future-ready and environmentally resilient design, featuring multiple access from National Highway-48, Pataudi Road, and Dwarka Expressway with a mixed land use of 56.08% commercial, 40.05% residential, 2.73% institutional and 1.14% utility.

Development phases

Phase 1 (Trunk Infrastructure)By December 2026587 acres; roads, drainage, utilities, 350-million-litrewater reservoir; ₹940 crore investment; 20% complete asofPhases 2–3 (Built Environment & SpecialisedZones)2027–2035Residential towers, commercial hubs, institutionalbuildings, retail, hospitals, schools, AI/fintech/biotechinnovation

Land use

Commercial56%Residential40%Institutional3%Utility1%

Frequently asked questions

What are the four highway connections planned for Global City?

The township will be connected to the Dwarka Expressway, NH-48 (Delhi-Jaipur Highway), Pataudi Road and the Kundli-Manesar-Palwal (KMP) Expressway.

When will Phase 1 infrastructure be completed?

Chief Minister Nayab Singh Saini has officially confirmed a December 2026 target for Phase 1 completion.

How large is Global City and what is its total investment potential?

The project is being positioned as the Central Business District of the NCR, carrying an investment potential of around Rs 1 lakh crore (roughly $15 billion) and projected to generate over five lakh jobs once fully operational.

What do urban experts say about multi-highway connectivity for large townships?

Urban transport experts said large greenfield projects need multiple entry and exit points rather than dependence on a single highway, which would ease congestion, aid emergency response and improve freight movement, though road-widening alone will not ensure sustainable mobility, calling for parallel investment in mass transit, and infrastructure for pedestrians and cyclists.

What is the internal mass transit system planned for Global City?

There will be a 6 km mass rapid transit system with six stations inside Global City, with over 80% of homes and offices within a 5-minute walk of a station.

What is the breakdown of land use in Global City?

The city has a mixed land use of 56.08% commercial, 40.05% residential, 2.73% institutional and 1.14% utility with an average FAR of 3 (ranging from 1.5 to 12.5).

When is the full Global City project expected to be complete?

Full project completion is targeted for 2035.

Sources

Interested in Global City Gurugram?

Register once — get informed when projects, plot schemes or launches open up here.