Upcoming Project
Sunteck Altavia Tower 2 in Goregaon West: Launch Timing, Pricing and Possession
Sunteck Realty's Altavia Tower 2 at Oshiwara District Centre, Goregaon West, Mumbai, is listed as upcoming. The developer said on 27 October 2026 that the tower's launch and construction start are planned for October 2026 to March 2027, while listing pages already show a MahaRERA registration and an open expression of interest.

| Status (as of 5 November 2026) | Upcoming. Management has planned the Tower 2 launch and construction start for H2 FY27 (October 2026 to March 2027). |
|---|---|
| Developer | Sunteck Realty Limited |
| Location | Somani Gram, off S.V. Road, Goregaon West, Mumbai 400104, within Oshiwara District Centre (ODC) |
| Configurations | 3 BHK (carpet area 1,267 to 1,401 sq ft) and 4 BHK (carpet area 1,657 to 1,700 sq ft) |
| Listed prices | 3 BHK from ₹3.75 Cr and 4 BHK from ₹4.90 Cr, plus charges; ₹32,000 per sq ft on the developer page (undated, stated as negotiable) |
| Booking amount | Expression of interest at ₹11 lakh on listing pages |
| RERA | MahaRERA registration PR1181012502068 |
| Proposed possession | 31 December 2031, per the RERA certificate as reported on a listing site |
| Scale | Two towers of G+42 storeys with about 285 units |
Status: what has launched and what is still to come
Sunteck Realty's Altavia project is being built in two towers. On its 27 October 2026 earnings call, management said Tower 1 has launched. It said the Tower 2 launch and the start of its construction are planned for H2 FY27, which runs from October 2026 to March 2027.
Listing pages already carry the Tower 2 RERA registration, PR1181012502068, and show an open expression of interest at ₹11 lakh. Management's timeline and those listing pages describe different stages, so buyers should check the current booking terms with the developer before committing money. As of 5 November 2026, no Tower 2 construction start has been reported.
Project design and scale
The project is a residential block of towers over a podium, with 4 basements, a ground floor and 4 podium levels. Residential floors run from the 5th to the 41st, and the 42nd floor holds the clubhouse and a rooftop pool. The developer's site describes four apartments per floor in Wing A, each with a private lift opening into the home and a 21,000 sq ft entrance lobby.
- Land: about 3.85 acres, per a listing site; the developer site and other listings give 3 to 3.25 acres.
- Units: 285, per the RERA building table on a listing site.
- Lifts: nine high-speed elevators plus a private lift for each home.
- Clubhouse: 45,000 sq ft on the 42nd floor; amenity podium of 32,000 sq ft.
The listed amenities include swimming pools, a gymnasium, a spa, tennis, badminton and basketball courts, a children's creche, a jogging track, a banquet hall and co-working space. Power backup is 100% and water supply is 24x7.
Configurations and prices
The project offers 3 BHK and 4 BHK apartments. The developer's price page lists 3 BHK homes from ₹3.75 Cr and 4 BHK homes from ₹4.90 Cr, plus charges, and gives a rate of ₹32,000 per sq ft, which it describes as negotiable. None of these prices carries a date on the page.
Listing pages describe a Construction Linked Plan as the payment structure, and one developer page also shows a 25:25:25:25 split. The developer's page lists possession charges of ₹6.5 lakh for a 3 BHK and ₹7.5 lakh for a 4 BHK. Some listings quote carpet areas up to 1,800 sq ft, but this figure is not on the developer's price sheet.
Location and connectivity
The site sits on the Ram Mandir Road side of Oshiwara District Centre in Goregaon West. Ram Mandir railway station is about 450 m away, according to a listing site. Goregaon station on the Western line is also nearby.
- Oshiwara metro station (Line 2A, Yellow Line): about 1.0 km.
- Metro Line 7 (Western Express Highway): about 2.2 km.
- Metro Line 6: under construction, with a station at Lower Oshiwara about 1.2 km away.
- Western Express Highway: about 2.0 km. JVLR access: about 1.5 km.
- Mrinal Tai Gore Flyover: about 0.8 km. The extended flyover opened to traffic on 6 June 2026, linking Ram Mandir Road with Goregaon.
Nearby daily needs include a DMart about 500 m away and Infiniti Mall about 2.5 km away.
Infrastructure under way
The Goregaon-Mulund Link Road is under construction as a BMC project. A Goregaon-side flyover between Dindoshi Court and Film City was targeted for opening on 15 October 2026, and the full corridor is reported for completion in 2028 or early 2029. A cable-stayed bridge across Goregaon Creek, linking Goregaon and Oshiwara, is estimated at ₹418 crore for a 542 m span, with completion reported by October 2028.
Market context
Listed 3 and 4 BHK prices on a listing site imply a locality rate of about ₹28,111 to ₹29,193 per sq ft. The same listing site projects monthly rents of ₹75,000 to ₹1,12,500 for 3 BHK homes and ₹98,000 to ₹1,47,000 for 4 BHK homes. These are projections, not observed rents.
Sunteck's other Goregaon West projects are listed at similar or lower price points. Sunteck City Avenue 4 lists 3 BHK homes at ₹3.29 to ₹3.97 Cr, and Sunteck City Avenue 2 lists 1 to 3 BHK homes at ₹1.8 to ₹5 Cr.
Developer background
Sunteck Realty Limited was founded in 2000 by Kamal Khetan and is listed on the NSE and BSE. Its projects are in Mumbai and the wider Mumbai region, including BKC, ODC Goregaon, Borivali, Airoli and Thane. The company reported H1 FY27 presales of ₹1,611 crore and collections of ₹780 crore on 27 October 2026, and a FY27 launch pipeline of about ₹7,000 crore excluding Dubai.
Buyer costs in Mumbai
Buyers should budget for the following state and central charges, which apply to any Mumbai purchase:
- Stamp duty: 6% for male buyers and 5% for women, including a 1% metro cess.
- Registration: 1% of property value, capped at ₹30,000 for homes above ₹30 lakh.
- GST: 5% on under-construction homes that are not affordable, without input tax credit. Homes with an occupation certificate attract no GST.
Frequently asked questions
Has Altavia Tower 2 launched?
On 27 October 2026, management said Tower 1 has launched and that the Tower 2 launch and construction start are planned for October 2026 to March 2027. Listing pages show an open expression of interest at ₹11 lakh for the project.
What configurations are offered at Sunteck Altavia Goregaon West?
The project offers 3 BHK apartments with carpet areas of 1,267 to 1,401 sq ft and 4 BHK apartments with carpet areas of 1,657 to 1,700 sq ft, according to the developer's site.
What is the expected possession date?
The RERA certificate gives a proposed completion date of 31 December 2031, and the developer's listing pages show the same month for possession.
What is the MahaRERA registration number?
The project is registered with MahaRERA under PR1181012502068, which listing pages name for Tower 2.
How far is the project from the metro?
Oshiwara metro station on Line 2A is about 1.0 km away, and Ram Mandir railway station is about 450 m away. Metro Line 6 is under construction.