UPSIDA Issues Letter of Intent to Airtel Nxtra for 10 MW Data Centre at Saraswati Hi-Tech City, Prayagraj

The Uttar Pradesh State Industrial Development Authority (UPSIDA) issued a letter of intent to Airtel Nxtra Private Limited on 5 November 2026 for a proposed 10 MW data centre at Saraswati Hi-Tech City, Prayagraj. The estimated investment is about ₹220 crore with around 300 direct and indirect jobs, and the project was at the letter-of-intent and land-allotment stage as of 11 November 2026.

Prayagraj Industrial Smart City — UPSIDA Issues Letter of Intent to Airtel Nxtra for 10 MW Data Centre at Saraswati Hi-Tech City, Prayagraj
DecisionLetter of intent (LoI) for land allotment
Deciding bodyUttar Pradesh State Industrial Development Authority (UPSIDA)
Date of decision5 November 2026
CompanyAirtel Nxtra Private Limited
FacilityProposed 10 MW data centre
LocationSaraswati Hi-Tech City, Prayagraj, Uttar Pradesh, next to the Prayagraj IMC site
Plots referencedPlots numbered 5 and 7 at Saraswati Hi-Tech City
Estimated investmentAbout ₹220 crore
Expected jobsAround 300 direct and indirect
Status as of 11 November 2026Letter-of-intent and land-allotment stage

What the authority decided

On 5 November 2026, UPSIDA issued a letter of intent to Airtel Nxtra Private Limited for a proposed 10 MW data centre at Saraswati Hi-Tech City, Prayagraj. A letter of intent is the state body's formal step to signal that it intends to allot land for the facility. The reporting says the process for plots at Saraswati Hi-Tech City has started.

This is a government decision on land for a digital-infrastructure facility. It is not a sale of a residential or commercial property to individual buyers. Coverage of the decision followed on 6 and 7 November 2026.

Operative details: plots, capacity and investment

The reported details of the decision are set out below.

The reporting describes the land-allotment process as initiated. Full wording on the plot process is partly cut short in the source, so buyers and investors should check the allotment terms with UPSIDA directly.

Where the site sits in the IMC Prayagraj plan

The Integrated Manufacturing Cluster (IMC) Prayagraj, also searched as Prayagraj IMC, is a national industrial node built by NICDC and UPSIDA at Karchana block, beside Saraswati Hi-Tech City near Naini, about 25 km south of Prayagraj city. The notified area is 351.43 to 352 acres, made up of 231 acres of greenfield land and 120 acres within Saraswati Hi-Tech City.

Key steps in the cluster so far:

By the July 2026 project status record, 351.43 acres had been transferred to the project company, AKIC Integrated Manufacturing Cluster Agra-Prayagraj Ltd, with matching equity of ₹323.09 crore released by NICDIT. Four industrial plots covering about 42 acres had been allotted to investors.

What the decision means in practice

A letter of intent comes before the final land allotment. The next steps are land allotment and project progress, and both follow the letter. The facility is at the letter-of-intent and land-allotment stage as of 11 November 2026. Buyers should not treat the letter as a completed allotment or as an operating facility.

For local job seekers, the data centre adds about 300 direct and indirect jobs to the zone. NICDC's project material puts the wider IMC Prayagraj employment potential at 17,700 jobs.

Residential and commercial plots at Saraswati Hi-Tech City were offered through a separate UPSIDA e-auction. Registration opened on 9 July 2026, the EMD deadline was 27 July 2026, and online bidding was scheduled for 31 July 2026. Those dates had passed as of 11 November 2026. That auction is a separate channel from the industrial and digital-infrastructure land described on this page.

About the company

Airtel Nxtra Private Limited is the data centre arm of the Bharti Airtel group, named Nxtra by Airtel in its own materials. The company is the party named in this letter of intent for the proposed 10 MW facility at Saraswati Hi-Tech City, Prayagraj.

Frequently asked questions

Who received the UPSIDA letter of intent at Saraswati Hi-Tech City?

Airtel Nxtra Private Limited received the letter of intent from UPSIDA on 5 November 2026 for a proposed 10 MW data centre at Saraswati Hi-Tech City, Prayagraj.

Is a letter of intent the same as a plot allotment?

No, a letter of intent comes before the final allotment. The reporting says the land-allotment process for plots at Saraswati Hi-Tech City has started and that allotment and project progress will follow the letter.

How big is the proposed data centre and what investment is planned?

The proposed facility is a 10 MW data centre with an estimated investment of about ₹220 crore and around 300 direct and indirect jobs.

Does this decision affect people buying homes or shops in Saraswati Hi-Tech City?

No, this decision concerns land for a digital-infrastructure facility and is not a residential or commercial property sale. Residential and commercial plots there were offered through a separate UPSIDA e-auction announced in July 2026.

Where is the site and how does it relate to the Prayagraj IMC?

The data centre is proposed at Saraswati Hi-Tech City, next to the Prayagraj IMC site in Karchana block, about 25 km south of Prayagraj city. The IMC's notified land includes 120 acres within Saraswati Hi-Tech City.